051907-009-TwinsBallparkSite.jpg
Size of this preview:
800 × 482 pixels
.
Other resolutions:
320 × 193 pixels
|
640 × 386 pixels
|
1,024 × 617 pixels
|
1,280 × 772 pixels
|
3,072 × 1,852 pixels
.
Summary
Description 051907-009-TwinsBallparkSite.jpg |
English:
The site of the under-construction
Twins Ballpark
, two-days before construction commenced on May 21, 2007. The location is bordered by 7th St. N (overpass on left), the Hennepin Energy Recovery Center (HERC) (building with smokestacks at rear left as well as the similarly colored small building to the right of it), 5th St. N (overpass on the right side), and the 394 exits (foreground).
|
Date | |
Source | Own work |
Author | Bobak Ha'Eri |
Permission
( Reusing this file ) |
CC-By-SA-3.0 |
Photo taken by Bobak Ha'Eri , on May 19, 2007. Please observe license and properly cite in use outside Wikipedia.
Licensing
I, the copyright holder of this work, hereby publish it under the following license:
This file is licensed under the
Creative Commons
Attribution 3.0 Unported
license.
-
You are free:
- to share – to copy, distribute and transmit the work
- to remix – to adapt the work
-
Under the following conditions:
- attribution – You must give appropriate credit, provide a link to the license, and indicate if changes were made. You may do so in any reasonable manner, but not in any way that suggests the licensor endorses you or your use.