Zibo–Dongying_railway

Zibo–Dongying railway

Zibo–Dongying railway

Railway line


The Zibo–Dongying railway or Zidong railway (simplified Chinese: 淄东铁路; traditional Chinese: 淄東鐵路; pinyin: zīdōng tiělù), also called the Zhangdian–Dongying railway or Zhangdong railway, is a railroad in Shandong Province of northern China, between Zibo and Dongying. The railway has a total length of 91 kilometres (57 mi).[1] and was completed in 1972.[1] The line branches off of the Jiaozhou–Jinan railway at the Zhangdian station near Zibo. Major cities and towns along route include Zibo, Boxing County, and Dongying.

Quick Facts Overview, Native name ...

History

From Apr 14th 2016, Zidong railway began upgrading with total investment of 1.1 Billion RMB, and the scheduled completion date is the end of 2017. After this upgrade, the rail speed limit of Zidong railway will upgrade from less than 50 km/h to 120 km/h.[2] Dongying will be fully connected with Qingdao–Jinan railway within 1 hour, and travel time between Dongying and Jinan will be shortened from 3.5h to 2h.

The electrified railway reopened on 30 September 2018.[3]

Rail Connections

See also


References

  1. 山东交通 (in Chinese). Retrieved October 16, 2011.
  2. 网易. "淄东铁路扩能改造正式开工_网易新闻". news.163.com. Retrieved 2017-07-31.
  3. "【信息速递】淄东铁路扩能改造工程顺利开通,向国庆69周年献礼!" [Information Express: The East China Railway expansion project was successfully opened to pay tribute to the 69th anniversary of the National Day!] (in Chinese). 3 October 2018. Retrieved 14 January 2021.

Share this article:

This article uses material from the Wikipedia article Zibo–Dongying_railway, and is written by contributors. Text is available under a CC BY-SA 4.0 International License; additional terms may apply. Images, videos and audio are available under their respective licenses.