West_Kowloon_Corridor

West Kowloon Corridor

West Kowloon Corridor

Trunk road in Kowloon, Hong Kong


West Kowloon Corridor is part of Route 5 in Hong Kong. Bypassing existing surface roads in West Kowloon, it connects Lai Chi Kok Road in Cheung Sha Wan with the Gascoigne Road Flyover near Yau Ma Tei.

Quick Facts Traditional Chinese, Simplified Chinese ...

The highway was built in 4 phases:

  • Phase 1 (1977) consists of a flyover 1.2 km (0.75 mi) long, linking Gascoigne Road and Ferry Street.[1] This section is characterised by the section of road going through Yaumatei Carpark Building.
  • Phase 2 (1983) includes flyovers between Cherry Street in Tai Kok Tsui and Yen Chow Street in Sham Shui Po. It runs on separate viaducts in each direction: southbound traffic goes over Tung Chau Street and Tong Mi Road, while northbound traffic goes over Cherry Street and Tai Kok Tsui Road before merging over Tung Chau Street.
  • Phase 3 (1987) carries on over Tung Chau Street to meet Lai Chi Kok Road in Cheung Sha Wan.
  • Phase 4 was completed in 1997, connecting the flyovers of phases 1 and 2.

To make way for the new Fu Cheong Estate, the off-slips at the old terminus on Yen Chow Street were demolished; they have yet to be replaced.

Many red public minibus routes which serve between New Territories West (Yuen Long, Tuen Mun, Tsuen Wan or Kwai Chung) and Kowloon South (Mong Kok or Jordan Road) or Hong Kong Island are routed via West Kowloon Corridor so as to provide faster routes to Mong Kok, Yau Ma Tei and Jordan to avoid traffic congestion in Sham Shui Po.


References

22.3207°N 114.1628°E / 22.3207; 114.1628

Preceded by
Chatham Road North
Hong Kong Route 5

West Kowloon Corridor
Succeeded by
Lai Chi Kok Road

Share this article:

This article uses material from the Wikipedia article West_Kowloon_Corridor, and is written by contributors. Text is available under a CC BY-SA 4.0 International License; additional terms may apply. Images, videos and audio are available under their respective licenses.