The Varanasi–Chhapra line or Chhapra–Varanasi line is a railway route on the North Eastern Railway section of Indian Railways. This route plays an important role in rail transportation of Varanasi division and Azamgarh division of Uttar Pradesh state and Saran division of Bihar state.

Quick Facts Varanasi–Chhapra line with Aunrihar–Mau–Phephna branch line, Overview ...

The corridor passes through the Gangetic Plain of Uttar Pradesh and Bihar with a stretch of 206 km with consists of a branch line that starts from Aunrihar Junction with passing through Mau Junction and Ends at Phephna Junction with a stretch of 118 km.

History

The main railway line from Chhapra Junction to Varanasi City was originally built by Bengal and North Western Railway company as metre-gauge line during the 19th and 20th century also. This line was opened in different phases during the construction period.

  • The first phase, between Chhapra Junction to Revelganj halt was opened on 15 April 1891.
  • The second phase, between Revelganj Halt to Manjhi was opened on 1 April 1899.
  • The third phase, between Manjhi to Bakulha was opened on 7 February 1912.
  • The fourth phase, between Bakulha to Ballia was opened on 12 May 1899.
  • The fifth phase, between Ballia to Phephna Junction was opened on 13 March 1899.
  • The Sixth phase, between Phephna Junction to Ghazipur Ghat was opened on 10 March 1903.
  • The Seventh Phase, between Ghazipur Ghat to Aunrihar Junction was opened on 15 March 1909.
  • The Eighth Phase, between Aunrihar Junction to Varanasi City was also opened on 15 March 1909.

Whereas the branch line between Aunrihar Junction to Phephna Junction was opened in two phases during the construction period. The First phase between Aunrihar Junction to Mau Junction was opened on 15 March 1899 and the second phase between Indara Junction to Phephna Junction was also opened on 15 March 1899.[1]

After that, this line was transferred from the initial jurisdiction to Oudh Tirhut Railway, after the amalgamation of: Bengal and North Western Railway, the Tirhut Railway, Mashrak-Thawe Extension Railway, Rohilkund and Kumaon Railway Company on 1 January 1943.[citation needed]

Later, on 14 April 1952, this line was transferred to the jurisdiction of North Eastern Railway, after the amalgamation of Oudh Tirhut Railway and Assam Railway Company.[2]

After that, the conversion into 5 ft 6 in (1,676 mm) broad gauge was completed through different phases starting from the first phase between Varanasi City to Indara Junction at 1990, and the second phase between Aunrihar Junction to Chhapra Junction at 1996 and another phase between Indara Junction to Phephna Junction at 1999.[3]

Electrifiction

The electrification trial and inspection on Varanasi–Chhapra line was completed in December 2018.[4]

List of trains Passing through this line

Main

Branch


References

  1. "Indian Railways history". Retrieved 6 November 2012.
  2. North Eastern Railway, Retrieved 17 May 2019
  3. "Varanasi Division". North Eastern Railway. Archived from the original on 9 January 2014. Retrieved 24 May 2013.

Share this article:

This article uses material from the Wikipedia article Varanasi–Chhapra_line, and is written by contributors. Text is available under a CC BY-SA 4.0 International License; additional terms may apply. Images, videos and audio are available under their respective licenses.