United_States_Bicycle_Route_System

United States Bicycle Route System

United States Bicycle Route System

US national cycling route network


The United States Bicycle Route System (abbreviated USBRS) is the national cycling route network of the United States. It consists of interstate long-distance cycling routes that use multiple types of bicycling infrastructure, including off-road paths, bicycle lanes, and low-traffic roads. As with the complementary United States Numbered Highways system for motorists, each U.S. Bicycle Route is maintained by state and local governments. The USBRS is intended to eventually traverse the entire country, like the Dutch National Cycle Routes and the United Kingdom's National Cycle Network, yet at a scale similar to the EuroVelo network that spans Europe.

Quick Facts System information, Length ...

The USBRS was established in 1978 by the American Association of State Highway and Transportation Officials (AASHTO), the same body that coordinates the numbering of Interstate highways and U.S. Routes. The first two U.S. Bicycle Routes were established in 1982 and remained the only two until 2011. Steady growth and interest in the system has followed since.[2][3][4] As of November 2022, 29 parent routes and 24 child routes extend 18,953 miles (30,502 km) across 34 states and the District of Columbia.[1] The system, once fully connected, is projected to encompass over 50,000 miles (80,000 km) of bike routes.[5]

Layout

Like United States Numbered Highways and many national routing systems, the U.S. Bicycle Route system is designed to roughly follow a grid. Mainline routes are the major cross-country routes and are represented with one- or two-digit numbers. Even-numbered routes are planned to primarily run east–west, with low-numbered routes in the north and high-numbered routes in the south. Odd-numbered routes will primarily run north–south, with low-numbered routes starting in the east and ascending in number toward the west. Three-digit numbers are assigned to auxiliary routes, with the last two digits denoting the parent that the auxiliary connects to. Much like other routing systems, the grid is sometimes violated; for example, U.S. Bicycle Route 76 (USBR 76) is projected to turn to the north in Colorado and end in Oregon as opposed to California, south of (and temporarily concurrent with) USBR 20 but far north of USBR 50. As with auxiliary Interstate Highways, two distinct U.S. Bicycle Routes in two different states along the same mainline route may share the same three-digit number without any plan to connect the routes. The first example of this repetition occurred in 2021 with the approval of USBR 230 in Ohio, which is not intended to connect to an existing USBR 230 in Wisconsin.[6]

The existing USBR 1 will be the easternmost route, though USBR 5 will run farther east of it in Virginia and the Carolinas. The westernmost and northernmost routes are USBR 97 and USBR 8, respectively, both of which are in the state of Alaska, but USBR 97 also enters Washington. Outside of Alaska, the westernmost route is expected to be USBR 95 and the northernmost USBR 8. USBR 90 is expected to be the southernmost route.[7] Despite the analogy the system has to the U.S. Highway system, the USBRS's route numbers do not necessarily trace the same route as the corresponding U.S. Highway number; for example, while USBR 1 will run close to the East Coast and thus parallel U.S. Route 1 (US 1), the projected route of USBR 10 generally follows US 2.

In order for a route to qualify as a U.S. Bike Route, it needs to connect two or more states, connect multiple U.S. Bike Routes, or connect a U.S. Bike Route with a national border.

History

The USBRS was established in 1978 by AASHTO for the purpose of "facilitat[ing] travel between the states over routes which have been identified as being more suitable than others for cycling."[8]

The first routes were defined in 1982: U.S. Bicycle Route 1 (USBR 1) from North Carolina to Virginia, and the stretch of USBR 76 from Illinois through Kentucky to Virginia. These two routes remained the only routes in the system until 2011. In the interim, only minor routing changes had been made in Virginia.

AASHTO established a new task force in 2003 to study expansion of the system.[2][9][10] The task force included state and federal highway officials and representatives from bicycling organizations. In October 2008, AASHTO approved a national-level corridor and route designation plan.[11] Other organizations involved in the effort include state departments of transportation, the Federal Highway Administration (FHWA), and the Adventure Cycling Association.

In 2009, the U.S. House of Representatives proposed moving the U.S. Bicycle Route System under the authority of the FHWA as part of a new Office of Livability.[12] In 2009, the FHWA published a new edition of the Manual on Uniform Traffic Control Devices that introduces a revised U.S. Bicycle Route shield. Compared to the 2003 edition, the new design swaps the bicycle symbol and route number.[9]

In early May 2011, the first major expansion of the system was made. Five new parent routes, two child routes, and one alternate route were created, along with modifications to the existing routes in Virginia and the establishment of USBR 1 in New England.[3][4]

In 2012, the FHWA approved the use of an alternative U.S. Bicycle Route marker design on an interim basis. The alternative design departs from the longstanding "acorn" shape in favor of a Reuleaux triangle placed over a green background.[13] The FHWA gave 17 states interim approval to use the alternative design[14] before formally incorporating it into the Manual on Uniform Traffic Control Devices in 2023.[15]

Across 2013, several other additions to the system were made. After approval in 2012, signage for USBR 45 in Minnesota was completed in the summer. An expansion of USBR 76 into Missouri was signed in October, and both Tennessee and Maryland entered the system on November 5 with USBR 23 and USBR 50, respectively.[5] Florida has also begun planning on four bicycle routes, including its stretch of USBR 1 and USBR 90.[16]

List of routes

As of November 2022, there are 31 official parent routes in varying stages of completion. In areas where a specific route has not been approved by AASHTO, there is only a prioritized corridor. The 24 existing subsidiary and alternate routes are grouped with their one- or two-digit parents.[6] Approved or signposted routes are located in the District of Columbia and 33 states: Alaska, Arizona, California, Connecticut, Delaware, Florida, Georgia, Kentucky, Idaho, Illinois, Indiana, Kansas, Maine, Maryland, Massachusetts, Michigan, Minnesota, Missouri, Nevada, New Hampshire, New York, North Carolina, North Dakota, Ohio, Oklahoma, Pennsylvania, Tennessee, Utah, Vermont, Virginia, Washington, Wisconsin, and West Virginia. Ohio has the most of any state, with eight active routes total.[17]

More information Route number, States with approved routes ...

List of prioritized corridors

Below is an incomplete list of prioritized corridors, "50-mile-wide areas where a route may be developed":[7]

More information Route number, Locale ...

See also

U.S. state bicycle route systems:


References

  1. "A new state joins the USBRS!" (Press release). Missoula, Montana: Adventure Cycling Association. November 30, 2022. Archived from the original on March 7, 2023. Retrieved April 16, 2023.
  2. Lahood, Ray (July 2, 2010). "US Bicycle Route System begins connecting America". United States Department of Transportation. Archived from the original on July 5, 2010. Retrieved July 7, 2010.
  3. Adventure Cycling Association (May 11, 2011). "AASHTO Approves New U.S. Bicycle Routes Across America" (Press release). Adventure Cycling Association. Archived from the original on August 14, 2011. Retrieved August 23, 2011.
  4. Sullivan, Ginny (May 11, 2011). "It's Official! New U.S. Bicycle Routes Approved". Adventure Cycling Association. Archived from the original on September 22, 2011. Retrieved August 23, 2011.
  5. Adventure Cycling Association (November 5, 2013). "New U.S. Bicycle Routes Approved in Maryland and Tennessee" (Press release). Missoula, MT: Adventure Cycling Association. Archived from the original on November 10, 2013. Retrieved November 5, 2013.
  6. "U.S. Bicycle Route System Adds 2,903 Miles of New Routes in 5 States" (Press release). Missoula, Montana: Adventure Cycling Association. August 9, 2021. Archived from the original on October 20, 2021. Retrieved August 10, 2021.
  7. Adventure Cycling Association (June 2011). The United States Bicycle Route System: Corridor Plan (PDF) (Map). Adventure Cycling Association. Archived from the original (PDF) on December 27, 2009. Retrieved August 23, 2011.
  8. American Association of State Highway and Transportation Officials (June 30, 1982). "Route Number Designations". Archived from the original on May 15, 2006. Retrieved May 12, 2006 via Maine Department of Transportation.
  9. Moeur, Richard C. "AASHTO Ad Hoc Task Force on U.S. Bicycle Routes" (PDF). American Association of State Highway and Transportation Officials. Archived from the original (PDF) on May 25, 2006. Retrieved May 12, 2006.
  10. "AASHTO Task Force on Numbered Bicycle Routes" (PDF). American Association of State Highway and Transportation Official. Retrieved January 27, 2007.
  11. Adventure Cycling Association. "Background on Current USBRS Effort". Adventure Cycling Association. Archived from the original on February 9, 2009. Retrieved June 28, 2009.
  12. "Surface Transportation Authorization Act of 2009- Committee Draft" (PDF). Archived (PDF) from the original on July 17, 2011. Retrieved June 28, 2009.
  13. Lindley, Jeffrey A. (June 1, 2012). "Information: MUTCD — Interim Approval for the Optional Use of an Alternative Design for the U.S. Bicycle Route (M1-9) Sign (IA-15)". Letter to Directors of Field Services, Federal Lands Highway Division Engineers, Director of Technical Services, Division Administrators. Retrieved August 20, 2018.
  14. "List of Approved Requests for Interim Approval". Federal Highway Administration. November 17, 2023. Archived from the original on December 19, 2023. Retrieved December 19, 2023.
  15. Manual on Uniform Traffic Control Devices for Streets and Highways (PDF) (11th ed.). Washington, D.C.: Federal Highway Administration. December 19, 2023. p. 1078. Retrieved December 19, 2023.
  16. "Florida Planning U.S. Bicycle Route for Long-Distance Bike Travel". November 10, 2013. Archived from the original on November 11, 2013. Retrieved November 11, 2013.
  17. "National Corridor Plan". Adventure Cycling Association. June 2018. Archived from the original on August 20, 2018. Retrieved August 19, 2018.
  18. "Application for Designation of a U.S. Bicycle Route" (PDF). Maine Department of Transportation. January 5, 2011. p. 3. Archived (PDF) from the original on March 4, 2016. Retrieved October 4, 2015.
  19. "Application for Designation of a U.S. Bicycle Route" (PDF). New Hampshire Department of Transportation. February 4, 2011. p. 3. Archived (PDF) from the original on November 28, 2014. Retrieved October 4, 2015.
  20. Adventure Cycling Association (December 16, 2014). "U.S. Bicycle Route System Grows to over 8,000 Miles" (Press release). Adventure Cycling Association. Archived from the original on October 5, 2015. Retrieved October 4, 2015.
  21. "USBRS Adds New Route on Eastern Seaboard and 150 miles!". Adventure Cycling Association. December 6, 2021. Archived from the original on December 10, 2021. Retrieved December 10, 2021.
  22. Special Committee on U.S. Route Numbering (November 2020). "2020 Annual (Fall) Meeting Report to the Council on Highways and Streets" (PDF) (Report). Washington, DC: American Association of State Highway and Transportation Officials. Archived from the original (PDF) on January 10, 2021. "USRN Applications" (PDF). Archived from the original (PDF) on January 10, 2021.
  23. "2010 Virginia Bicycling Guide" (PDF). Virginia Department of Transportation. September 23, 2010. p. 5. Archived (PDF) from the original on April 13, 2015. Retrieved September 4, 2015.
  24. Special Committee on U.S. Route Numbering (May 21, 2019). "2019 Spring Meeting Report to the Council on Highways and Streets" (PDF) (Report). Washington, DC: American Association of State Highway and Transportation Officials. Archived from the original (PDF) on July 12, 2019. Retrieved July 12, 2019.
  25. Prasad, Ananth (October 1, 2014). "Application for Designation of a U.S. Bicycle Route (October 24, 2012)" (PDF). Letter to Bud Wright. p. 23. Retrieved October 4, 2015 via American Association of State Highway and Transportation Officials.
  26. Van Note, Bruce (September 16, 2019). "Application for Designation of a U.S. Bicycle Route – Fall 2019" (PDF). Letter to AASHTO Special Committee on US Route Numbering. Retrieved November 10, 2019.
  27. "Application for Designation of a U.S. Bicycle Route" (PDF). Alaska Department of Transportation & Public Facilities. September 10, 2010. Archived from the original on November 27, 2014. Retrieved October 4, 2015.
  28. Lahood, Ray (June 17, 2011). "US Bike Route showing no signs of growing pains". United States Department of Transportation. Archived from the original on June 23, 2011. Retrieved June 22, 2011.
  29. Adventure Cycling Association (May 26, 2015). "U.S. Bicycle Route System Expands 900 Miles, Adds Two States" (Press release). Adventure Cycling Association. Archived from the original on September 5, 2015. Retrieved September 15, 2015.
  30. Anninos, Jack A. (April 11, 2018). "Application for Designation of a U.S. Bicycle Route" (PDF). Letter to American Association of State Highway and Transportation Officials. Retrieved August 19, 2018.
  31. Scott, Jerry (August 30, 2018). "Application for Designation of a U.S. Bicycle Route" (PDF). Letter to. Archived (PDF) from the original on March 5, 2020. Retrieved October 17, 2018.
  32. "Washington adds four new U.S. bike routes to its system" (Press release). Washington State Department of Transportation. August 9, 2021. Archived from the original on August 10, 2021. Retrieved August 9, 2021.
  33. "A new state joins the USBRS!" (Press release). Missoula, Montana: Adventure Cycling Association. November 30, 2022. Archived from the original on November 30, 2022. Retrieved December 1, 2022.
  34. Anninos, Jack A. (February 8, 2018). "Application for Designation of a U.S. Bicycle Route" (PDF). Letter to American Association of State Highway and Transportation Officials. Retrieved August 19, 2018.
  35. Anninos, Jack A. (February 8, 2018). "Application for Designation of a U.S. Bicycle Route" (PDF). Letter to American Association of State Highway and Transportation Officials. Retrieved August 19, 2018.
  36. "Kentucky expands cycling options with U.S. Bicycle Routes 21 and 23" (Press release). Adeventure Cycling Association. October 8, 2018. Archived from the original on October 15, 2018. Retrieved October 14, 2018.
  37. Special Committee on U.S. Route Numbering (May 2020). "2020 Spring Meeting Report to Council on Highways and Streets" (PDF) (Report). Washington, DC: American Association of State Highway and Transportation Officials. Archived from the original (PDF) on January 10, 2021. "USRN Applications" (PDF). Archived from the original (PDF) on January 10, 2021.
  38. "Wisconsin bicycle route recognized by national organization" (Press release). Wisconsin Department of Transportation. August 27, 2020. Archived from the original on January 31, 2021. Retrieved January 3, 2021.
  39. Gothie, Roy (April 12, 2018). "Application for Designation of a U.S. Bicycle Route" (PDF). Letter to American Association of State Highway and Transportation Officials. Retrieved August 19, 2018.
  40. "US BIke Route 230 - Directions from east to west" (PDF). Wisconsin Department of Transportation. August 26, 2020. Archived (PDF) from the original on October 31, 2020. Retrieved January 3, 2021.
  41. Michigan Department of Transportation. "Grand Opening & Ribbon Cutting US Bicycle Route 35—Traverse City, MI" (Press release). Michigan Department of Transportation. Archived from the original on April 17, 2012. Retrieved May 15, 2012.
  42. Special Committee on U.S. Route Numbering (September 25, 2015). "Special Committee on U.S. Route Numbering Report to the Standing Committee on Highways" (PDF) (Report). Washington, DC: American Association of State Highway and Transportation Officials. Archived from the original (PDF) on August 20, 2018. Retrieved October 2, 2015.
  43. DeBruyn, Josh (March 28, 2018). "Application for Designation of a U.S. Bicycle Route" (PDF). Letter to American Association of State Highway and Transportation Officials. Retrieved August 19, 2018.
  44. Special Committee on U.S. Route Numbering (May 29, 2014). "Report to SCOH" (Report). Washington, DC: American Association of State Highway and Transportation Officials. Archived from the original (DOCX) on February 26, 2020. Retrieved June 1, 2014.
  45. Gothie, Roy (April 12, 2018). "Application for Designation of a U.S. Bicycle Route" (PDF). Letter to American Association of State Highway and Transportation Officials. Retrieved August 19, 2018.
  46. Woodward, Calvin (December 31, 2008). "New interstate road map takes shape for bicyclists". Pittsburgh Post-Gazette. Archived from the original on August 20, 2018. Retrieved August 19, 2018.
  47. Starr, Stephen (December 14, 2020). "A new way to travel across the US". BBC Travel. Archived from the original on August 10, 2021. Retrieved August 9, 2021.
  48. Zelle, Charles A. (September 16, 2016). "U.S. Bicycle Route 41 AASHTO Application" (PDF). Letter to AASHTO Special Committee on US Route Numbering. Minnesota Department of Transportation. Retrieved November 27, 2016.
  49. Special Committee on U.S. Route Numbering (November 14, 2016). "Special Committee on U.S. Route Numbering" (PDF) (Report). Washington, DC: American Association of State Highway and Transportation Officials. Archived from the original (PDF) on June 3, 2019. Retrieved November 27, 2016.
  50. Adventure Cycling Association (May 21, 2012). "New U.S. Bicycle Routes Approved" (Press release). Adventure Cycling Association. Retrieved May 22, 2012.
  51. "Mississippi River Trail receives state bikeway designation, becomes first US Bicycle Route in Minnesota" (Press release). Minnesota Department of Transportation. May 21, 2012. Archived from the original on March 15, 2013. Retrieved November 9, 2013.
  52. Effland, Ronald E. (April 16, 2018). "Application for Designation of a U.S. Bicycle Route" (PDF). Letter to American Association of State Highway and Transportation Officials. Retrieved August 19, 2018.
  53. Messina, Matthew (February 19, 2018). "Application for Designation of a U.S. Bicycle Route" (PDF). Letter to American Association of State Highway and Transportation Officials. Retrieved August 19, 2018.
  54. Adventure Cycling Association (October 2, 2013). "USBR 76: Missouri Officially Designated and Signed". Archived from the original on November 15, 2013. Retrieved November 9, 2013.
  55. Messina, Matt (February 13, 2018). "Application for Designation of a U.S. Bicycle Route" (PDF). Letter to AASHTO Special Committee on US Route Numbering. Retrieved August 19, 2018.
  56. "New U.S. Bicycle Routes Expand Bicycle Travel Options in Four States" (Press release). Missoula, Montana: Adventure Cycling Association. June 9, 2016. Archived from the original on August 13, 2021. Retrieved August 12, 2021.

Share this article:

This article uses material from the Wikipedia article United_States_Bicycle_Route_System, and is written by contributors. Text is available under a CC BY-SA 4.0 International License; additional terms may apply. Images, videos and audio are available under their respective licenses.