Tuas South Incineration Plant

Tuas South Incineration Plant

Waste incineration facility in Singapore


Tuas South Incineration Plant is the largest waste incineration facility in Singapore. It was commissioned in June 2000. The plant can incinerate 3000 tonns of garbage everyday.[1] The incineration reduces the waste volume by 90%. The plant occupies 10.5 ha of reclaimed land. It was constructed at a cost of S$890 million. The plant also generate 80 MW of electricity.[2][3][4]

See also


References

  1. "No disruption to waste management in Singapore after fatal accident shut down Tuas incineration plant: NEA". CNA. Retrieved 2022-08-15.
  2. Broucher. TUAS SOUTH INCINERATION PLANT.
  3. Bai, Renbi; Sutanto, Mardina (2002). "The practice and challenges of solid waste management in Singapore". Waste management. 22 (5): 557–567. ISSN 0956-053X.
  4. Ali, Noorahmad Bin (2005). Corrosion in the boiler tubes of the Tuas South Incineration Plant, Singapore (Thesis). University of Southern Queensland.

1.2965°N 103.6205°E / 1.2965; 103.6205


Share this article:

This article uses material from the Wikipedia article Tuas_South_Incineration_Plant, and is written by contributors. Text is available under a CC BY-SA 4.0 International License; additional terms may apply. Images, videos and audio are available under their respective licenses.