Heat and power plant in Mytishchinsky District, Russia
Thermal Power Plant 27 Severnaya (Russian: ТЭЦ-27 «Северная») is a combined heat and power plant located in the village of Chelobityevo in Mytishchinsky District of Moscow Oblast, Russia.[1][2] It is owned and operated by Mosenergo. It provides heat and power to Mytishchi, as well as to Northern and North-Eastern Administrative Okrugs of Moscow.[3]
The decision to build the power plant was taken in 1980s. However, due to opposition of the local population the construction was postponed. The first unit became operational in 1996 and the second unit in 1998. The third unit was added in 2007 and the fourth unit in 2008.[4]