Mumbai_Central_metro_station

List of Mumbai Metro stations

List of Mumbai Metro stations

Add article description


This is a list of all stations of the Mumbai Metro, a rapid transit system serving Mumbai in the Mumbai Metropolitan Region of India. The Mumbai Metro is the Fifth transit system to be built in India. The first line of the Mumbai Metro was opened on 8 June 2014 with the Blue Line 1, with the current total number of 11 stations operating as of October 2019.[1]

Topological map of Mumbai's public transport system

Currently, the expansion of the Mumbai Metro network is going to be around 200 km (120 mi). This expansion will allow Mumbai to connect with its satellite cities that lay in the Mumbai Metropolitan Region.[2][3][4]

Each line of the Mumbai Metro is identified by a specific color. The system uses rolling stocks of standard gauge trains and has a combination of elevated, underground and at-grade lines.[5]

Metro stations

Terminal station
* Transfer station
†* Terminal and transfer station to other lines
†† Transfer station to Mumbai Suburban Railway and Mumbai Monorail
** Transfer station to other lines and Mumbai Suburban Railway and Mumbai Monorail
#* Terminal and transfer station to Mumbai Suburban Railway, Mumbai Monorail and Indian Railways
†¤ Terminal, transfer station to other lines, Mumbai Suburban Railway, Mumbai Monorail and Indian Railways

This list is sortable. Click on the icon in the column header to change sort key and sort order

More information Sr. No., Station name ...

Statistics

Total number of metro stations 189
Total number of metro stations under construction 178
Number of interchange stations 38
Number of Elevated stations 155
Number of underground stations 33
Number of At-Grade stations 1

Notes

  1. Currently, The metro stations of Gold Line 8 are at the DPR stage after that the number of stations should be increased.
  2. Currently, The metro stations of Purple Line 13 at the DPR stage after that the number of stations should be increased.
  3. Currently, The metro stations of Magenta Line 14 are at the DPR stage after that the number of stations should be increased.

See also


References

  1. "Mumbai Metro Blue Line 1 starts for public". India Today. 8 June 2014. Retrieved 19 October 2020.
  2. "Entire Mumbai Metro Network to start in 6 years". Times of India. 28 January 2020. Retrieved 30 January 2020.
  3. "Maha Mumbai Metro-Branding Vision and Style Guidelines". MMRDA. 28 February 2020. Retrieved 19 October 2020.
  4. "Mumbai Metro: Aarey's Gain Is Metro's Loss". India Today. 16 October 2020. Retrieved 17 October 2020.
  5. "Aarey station to serve two Metro routes: MMRC". Indian Express. 21 March 2018. Retrieved 22 March 2018.
  6. "Blue Star Wins Rs149 crore project from Mumbai Metro". Lokmat. 27 August 2020. Retrieved 30 August 2020.
  7. "Mumbai Metro hits tracks and Handful of Speed Bumps". Mid-Day. 22 June 2014. Retrieved 19 October 2019.
  8. "Andheri Metro Station renamed". Free Press Journal. 21 February 2017. Retrieved 22 February 2017.
  9. "Fire Breaks out at Asalpha metro station". Times Now. 27 December 2019. Retrieved 30 December 2019.
  10. "Metro 7 pillar core tilts at Aarey Road Junction". DNA. 22 October 2017. Retrieved 25 October 2017.
  11. "Metro 7A in Mumbai get twin tunnels". Hindustan Times. 24 January 2019. Retrieved 25 January 2019.
  12. "Mira Bhayander to be connected with metro". Times of India. 25 February 2017. Retrieved 26 February 2017.
  13. "Work on Metro 7 extension to start in six months MMRDA". DNA. 18 September 2018. Retrieved 20 September 2018.
  14. "MMRDA to revisit the alignment of Metro 5 corridor". The Hindu. 1 February 2020. Retrieved 2 February 2020.
  15. "Bhiwandi residents oppose Metro 5". The Asian Age. 1 August 2018. Retrieved 5 August 2018.
  16. "MMRDA plans themed metro stations". DNA. 30 March 2018. Retrieved 1 April 2018.
  17. "Metro may run over two proposed transport projects". Times of India. 21 November 2014. Retrieved 22 November 2014.
  18. "Charkop Car Depot to now house metro 7 and metro 2A:MMRDA". Mumbai Live. 23 January 2020. Retrieved 25 January 2020.
  19. "Metro Work to disrupt traffic on Jamshedji Tata Road". DNA. 29 July 2017. Retrieved 30 July 2017.
  20. "Tender Announced 4.43MW rooftop solar mumbai metro station". Merecom. 26 March 2020. Retrieved 30 March 2020.
  21. "BMC's flyover plan hits metro-2 roadblock". DNA. 2 July 2015. Retrieved 3 July 2015.
  22. "Bad Roads/No Roads at Metro Station". Times of India. 5 September 2020. Retrieved 6 September 2020.
  23. "Mumbai: MMRDA issues tender for ropeway project". Free Press Journal. 19 February 2020. Retrieved 20 February 2020.
  24. "Metro-III corridor: What lies ahead". Free Press Journal. 28 December 2019. Retrieved 29 December 2019.
  25. "Metro Tunnel at heritage area completed". Times of India. 17 October 2020. Retrieved 20 October 2020.
  26. "Two Mumbai Metro lines to get 187 escalators". Hindustan Times. 14 August 2019. Retrieved 15 August 2019.
  27. "Locals want CM to make metro 6 underground". Hindustan Times. 14 January 2020. Retrieved 15 January 2020.
  28. "Now Cycle away from the metro station". The Hindu. 24 February 2020. Retrieved 25 February 2020.
  29. "MMRDA picks contractor for civil work of Metro 5". The Hindu. 7 August 2019. Retrieved 8 August 2019.
  30. "Metro Line 5 Phase 1 deadline revised to 2024". Free Press Journal. 12 October 2020. Retrieved 15 October 2020.
  31. "Save landmark, change metro route:Kalyan residents". Hindustan Times. 14 December 2019. Retrieved 15 December 2019.
  32. "Wadala Thane metro line clears CRZ Hurdle". Mumbai Mirror. 27 February 2017. Retrieved 1 March 2017.
  33. "MMRDA Picks contractor for civil work of Metro 5". The Hindu. 7 August 2019. Retrieved 10 August 2019.
  34. "Plans to expand Metro connectivity in progress". DNA. 18 May 2019. Retrieved 19 May 2019.
  35. "Mumbai First station structure ready on Metro 2A". DNA. 13 April 2018. Retrieved 15 April 2018.
  36. "MMRDA approves two Metro corridors". The Hindu. 20 October 2016. Retrieved 21 October 2016.
  37. "MMRDA starts installing escalators for Metro Line 7". Mumbai Mirror. 21 September 2020. Retrieved 22 September 2020.
  38. "Mumbai: Metro 6 Corridor Moves Ahead With Launch Of Girders". Mid-Day. 13 November 2020. Retrieved 14 November 2020.
  39. "Thane residents see no end to road mess". Hindustan Times. 1 November 2019. Retrieved 2 November 2019.
  40. "Construction work on Metro 2B and 4 set to begin". Indian Express. 17 February 2018. Retrieved 20 February 2018.
  41. "Rs 393 crore contract to build five metro stations scrapped". DNA. 20 September 2018. Retrieved 25 September 2018.
  42. "Officials start casting of piers for metro line 9 near Pandhurang Wadi". Mumbai Live. 18 November 2020. Retrieved 20 November 2020.
  43. "Metro 6 Line will Cause Traffic Havoc:experts". Mumbai Mirror. 8 September 2018. Retrieved 10 September 2018.
  44. "DN Nagar-BKC Metro work to kick off by Feb '18". DNA. 14 November 2017. Retrieved 15 November 2017.
  45. "MMRDA approves two Metro corridors". The Hindu. 20 October 2016. Retrieved 2 December 2016.
  46. "IIT Vikhroli Metro Stretch work to worsen traffic snarls". DNA. 30 November 2017. Retrieved 1 December 2017.
  47. "Mumbai Metro work blocks link road at night". DNA. 22 July 2018. Retrieved 25 July 2018.
  48. "Kalyan Metro a distant dream". The Asian Age. 14 December 2018. Retrieved 15 December 2018.
  49. "CM Visits Metro 3 station at Sahar Road". Hindustan Times. 1 March 2020. Retrieved 5 March 2020.
  50. "MMRDA Initiates plan to Merge two metro corridors". Indian Express. 13 October 2020. Retrieved 14 October 2020.
  51. "Construction of 26 underground stations of metro 3 is on speed". Mumbai Live. 21 May 2020. Retrieved 25 May 2020.
  52. "Juhu locals crowdfunding fight against Metro". DNA. 1 April 2019. Retrieved 2 April 2019.
  53. "Prime Properties nearby to get special access". Mumbai Mirror. 8 January 2020. Retrieved 10 January 2020.
  54. "100 percent tunneling work completed at SEEPZ station". Metro Rail News. 14 December 2019. Retrieved 20 October 2020.
  55. "Mumbai metro sees investment of Rs 62,943 crore". 25 December 2017. Retrieved 26 December 2017.
  56. "Mumbai: 'Two Metro Lines To Be Ready Next Year', Says MMRDA". Mid-Day. 11 September 2020. Retrieved 12 September 2020.
  57. "Station at 48 metres to give bird's eye view of Chembur". DNA. 7 December 2010. Retrieved 10 December 2010.
  58. "Mumbai Metro to reach Virar". Hindustan Times. 4 October 2018. Retrieved 5 October 2018.
  59. "LBS Marg to be shut for Metro-4 work". The Asian Age. 19 March 2018. Retrieved 20 March 2018.
  60. "Design consultant for Mumbai Metro-7". Business Line. 17 January 2018. Retrieved 18 January 2018.
  61. "Mumbai Metro 4 Alignment changed once again". DNA. 6 May 2016. Retrieved 10 May 2016.
  62. "Mumbai gets two more Metro lines". Business Standard. 25 October 2017. Retrieved 26 October 2017.
  63. "Maha Cabinet gives go-ahead for two Metro lines". India Today. 27 September 2016. Retrieved 28 September 2016.
  64. "Who owns the Mumbai Metro car depot land?". India Today. 5 November 2020. Retrieved 6 November 2020.
  65. "GST bhavan and Wadala station to be merged". The Hindu. 15 January 2020. Retrieved 20 January 2020.
  66. "MMRDA places order for 72 Metro coaches". Times of India. 25 November 2020. Retrieved 26 November 2020.
  67. "Mira-Bhayandar metro rail work finally begins". Free Press Journal. 10 September 2019. Retrieved 11 September 2019.

Share this article:

This article uses material from the Wikipedia article Mumbai_Central_metro_station, and is written by contributors. Text is available under a CC BY-SA 4.0 International License; additional terms may apply. Images, videos and audio are available under their respective licenses.