Midland_Main_Line

Midland Main Line

Midland Main Line

Railway in the UK


The Midland Main Line (MML) is a major railway line from London to Sheffield in Yorkshire via the East Midlands. It comprises the lines from London's St Pancras station via Leicester, Derby/Nottingham and Chesterfield.

Quick Facts Overview, Status ...

Express passenger services on the line are operated by East Midlands Railway (EMR). The line is electrified between St Pancras and Corby, and the section south of Bedford forms a branch of the northern half of the Thameslink network, with a semi-fast service to Brighton and other suburban services. A northern part of the route, between Derby and Chesterfield, also forms part of the Cross Country Route operated by CrossCountry. Tracks from Nottingham to Leeds via Barnsley and Sheffield are shared with Northern. East Midlands Railway also operates regional and local services using parts of the line.

The Midland Main Line is undergoing a major upgrade of new digital signalling and full line electrification from London to Sheffield.[3] High Speed 2 was planned to branch onto the Midland Main Line at East Midlands Parkway railway station.[4]

History

Midland Counties early developments

The Midland Main Line (green) in relation to other main lines
British Rail APT-E built at Derby rail technical centre and extensively tested on the Midland Main Line its first run being on 25 July 1972 from Derby to Duffield

The Midland Main Line was built in stages between the 1830s and the 1870s. The earliest section was opened by the Midland Counties Railway between Nottingham and Derby on 4 June 1839.[5] On 5 May 1840 the section of the route from Trent Junction to Leicester was opened.[6]

The line at Derby was joined on 1 July 1840 by the North Midland Railway to Leeds Hunslet Lane via Chesterfield, Rotherham Masborough,[n 1] Swinton, and Normanton.

On 10 May 1844 the North Midland Railway, the Midland Counties Railway and the Birmingham and Derby Junction Railway merged to form the Midland Railway.

Midland Main Line southern extensions

Without its own route to London, the Midland Railway relied upon a junction at Rugby with the London and Birmingham Railway line for access to the capital at London Euston. By the 1850s, the junction at Rugby had become severely congested. The Midland Railway employed Thomas Brassey to construct a new route from Leicester to Hitchin via Kettering, Wellingborough, and Bedford giving access to London via the Great Northern Railway from Hitchin.[7] The Crimean War resulted in a shortage of labour and finance, and only £900,000 (equivalent to £91,341,964 in 2021)[8] was available for the construction, approximately £15,000 for each mile (equivalent to £1,522,366 in 2021.[9] To reduce construction costs, the railway followed natural contours, resulting in many curves and gradients. Seven bridges and one tunnel were required, with 60 ft (18 m) cuttings at Desborough and Sharnbrook. There are also major summits at Kibworth, Desbrough and at Sharnbrook where a 1 in 119 gradient from the south over 3 miles (4.8 km) takes the line to 340 feet (104 m) above sea level. This route opened for coal traffic on 15 April 1857, goods on 4 May, and passengers on 8 May.[10] The section between Leicester and Bedford is still part of the Midland Main Line.

While this took some of the pressure off the route through Rugby, the GNR insisted that passengers for London alight at Hitchin, buying tickets in the short time available, to catch a GNR train to finish their journey. James Allport arranged a seven-year deal with the GN to run into Kings Cross for a guaranteed £20,000 a year (equivalent to £2,030,000 in 2021).[8] Through services to London were introduced in February 1858.[11]

This line met with similar capacity problems at Hitchin as the former route via Rugby, so a new line was constructed from Bedford via Luton to St Pancras[12] which opened on 1 October 1868.[9] The construction of the London extension cost £9 million (equivalent to £861 million in 2021).[13]

As traffic built up, the Midland Railway opened a new deviation just north of Market Harborough railway station on 26 June 1885 to remove the flat crossing of the Rugby and Stamford Railway.[14]

Northernmost sections

Plans by the Midland Railway to build a direct line from Derby to Manchester were thwarted in 1863 by the builders of the Buxton line who sought to monopolise on[clarification needed] the West Coast Main Line.

In 1870, the Midland Railway opened a new route from Chesterfield to Rotherham which went through Sheffield via the Bradway Tunnel.

The mid-1870s, saw the Midland line extended northwards through the Yorkshire Dales and Eden Valley on what is now called the Settle–Carlisle Railway.

Before the line closures of the Beeching era, the lines to Buxton and via Millers Dale during most years presented an alternate (and competing) main line from London to Manchester, carrying named expresses such as The Palatine and the "Blue Pullman" diesel powered Manchester – London service (the Midland Pullman). Express trains to Leeds and Scotland such as the Thames–Clyde Express mainly used the Midland's corollary Erewash Valley line, returned to it, and then used the Settle–Carlisle line. Expresses to Edinburgh Waverley, such as The Waverley travelled through Corby and Nottingham.

Under British Railways and privatisation

Most Leicester-Nottingham local passenger trains were taken over by diesel units from 14 April 1958, taking about 51 minutes between the two cities.[15][full citation needed] When the Great Central Main Line closed in 1966, the Midland Main Line became the only direct main-line rail link between London and the East Midlands and parts of South Yorkshire.

The Beeching cuts and electrification of the West Coast Main Line brought an end to the marginally longer London–Manchester service via Sheffield.

In 1977, the Parliamentary Select Committee on Nationalised Industries recommended considering electrification of more of Britain's rail network, and by 1979 BR presented a range of options that included electrifying the Midland Main Line from London to Yorkshire by 2000.[16] By 1983, the line had been electrified from Moorgate to Bedford, but proposals to continue electrification to Nottingham and Sheffield were not implemented.

A Midland Mainline High Speed Train, introduced in 1983 by British Rail, at Nottingham in 2005

The introduction of the High Speed Train (HST) in May 1983, following the Leicester area resignalling, brought about an increase of the ruling line speed on the fast lines from 90 miles per hour (145 km/h) to 110 miles per hour (177 km/h).

Between 2001 and 2003, the line between Derby and Sheffield was upgraded from 100 miles per hour (161 km/h) to 110 miles per hour (177 km/h) as part of Operation Princess, the Network Rail funded CrossCountry route upgrade.

In January 2009, a new station, East Midlands Parkway, was opened between Loughborough and Trent Junction, to act as a park-and-ride station for suburban travellers from East Midlands cities and to serve nearby East Midlands Airport.[17]

Since then, 125 miles per hour (201 km/h) running has been introduced on extended stretches. Improved signalling, increased number of tracks, and the revival of proposals to extend electrification from Bedford to Sheffield are underway. Much of this £70 million upgrade, including some line-speed increases, came online on 9 December 2013 (see below).[18]

Network Rail route strategy for freight 2007

Network Rail published a Route Utilisation Strategy for freight in 2007;[19] over the coming years a cross-country freight route will be developed enhancing the Birmingham to Peterborough Line, increasing capacity through Leicester, and remodelling Syston and Wigston junctions.

Network Rail 2010 route plan

Near Felmerham
Bridges over the Midland Main Line have been replaced to allow greater clearances for electrification and larger rolling stock. Before (top) and after (bottom) the 2014 upgrade.

Traffic levels on the Midland Main Line are rising faster than the national average, with continued increases predicted. In 2006, the Strategic Rail Authority produced a Route Utilisation Strategy for the Midland Main Line to propose ways of meeting this demand;[20] Network Rail started a new study in February 2008 and this was published in February 2010.[21][22][23][24]

After electrification, the North Northamptonshire towns (Wellingborough, Kettering, and Corby) are planned to have an additional 'Outer Suburban service' into London St Pancras, similar to the West Midlands Trains' Crewe – London Euston services, to cater for the growing commuter market. North Northamptonshire is a major growth area, with over 7,400 new homes planned to be built in Wellingborough[25] and 5,500 new homes planned for Kettering.[26][27]

Highlights include:[28]

  • Work related to line speed increases, removing foot crossings and replacing with footbridges
  • Capacity enhancements for freight
  • Re-signalling of the entire route, expected to be complete by 2016 when all signalling will be controlled by the East Midlands signalling centre in Derby[29]
  • Rebuilding Bedford and Leicester[30]
  • Accessibility enhancements at Elstree & Borehamwood, Harpenden, Loughborough, Long Eaton, Luton, and Wellingborough by 2015[31][needs update]
  • Upgraded approach signalling (flashing yellow aspects) added at key junctions – Radlett, Harpenden, and Leagrave allowing trains to traverse them at higher speeds[needs update]
  • Lengthening of platforms at Wellingborough, Kettering, Market Harborough, Loughborough, Long Eaton, and Beeston stations as well as work related to the Thameslink Programme (see below)
  • Realignment of the track and construction of new platforms to increase the permissible speed through Market Harborough station from 60 mph to 85 mph saving 30–60 seconds
  • Electrification (see below)
  • Re-doubling the Kettering to Oakham Line between Kettering North Junction and Corby as well as re-signalling to Syston Junction via Oakham, allowing a half hourly London to Corby passenger service (from an infrastructure perspective) from December 2017 and creating additional paths for rail freight.[32][33]
New station building at West Hampstead Thameslink

The Thameslink Programme has lengthened the platforms at most stations south of Bedford to 12-car capability. St Pancras, Cricklewood, Hendon, and Luton Airport Parkway were already long enough, but bridges at Kentish Town mean it cannot expand beyond the current 8-car platform length. West Hampstead Thameslink has a new footbridge and a new station building. In September 2014 the current Thameslink Great Northern franchise was awarded and trains on this route are currently operated by Thameslink. In 2018 the Thameslink network expanded when some Southern services merged into it.

Station improvements

In 2013/14 Nottingham station was refurbished and the platforms restructured.

As part of Wellingborough's Stanton Cross development, Wellingborough station is to be expanded.[34]

Ilkeston between Nottingham and Langley Mill was opened on 2 April 2017.[35]

Two new stations are planned:

Some new stations have been proposed:

Extension of electrification

Electrification work and track being relaid at Wellingborough in 2019

Unlike the West Coast and East Coast Main Lines, the Midland Main Line has not been electrified along its full length. The line was electrified as far as Bedford in the early 1980s, but services relied on diesel traction beyond that.

In 2011 work commenced to extend the electrification, including to both Corby and Nottingham. Increasing costs initially saw this terminated at Kettering in 2017, but in 2021 work began on extending electrification to Market Harborough with plans to extend further to Sheffield.[42][43][44][45]

In May 2022, a briefing to contractors was released ahead of an invitation to tender for Midland Mainline Electrification project work to extend electrification to Nottingham and Sheffield. This scheme is expected to cost £1.3 billion.[46]

2021 Integrated Rail Plan

In November 2021 the Government announced its Integrated Rail Plan for the North and Midlands which made a number of proposals for the Midland Main Line. These included a commitment to complete the stalled electrification work, an upgrade to digital signalling, and a connection to High Speed 2. The latter would see a junction built south of East Midlands Parkway station rather than the previous plan of an East Midlands Hub further north on the Toton sidings. This will allow HS2 services to connect to both Derby and Nottingham city centres directly using the MML for access, which was a criticism of the previous HS2 eastern leg proposal.[4]

Route definition

The term Midland Main Line has been used from the late 1840s to describe any route of the Midland Railway on which express trains were operated.

It is first recorded in print in 1848 in Bradshaw's railway almanack of that year.[47] In 1849 it begins to be mentioned regularly in newspapers such as the Derby Mercury.[48]

In 1867, the Birmingham Journal uses the term to describe the new railway running into St Pancras railway station.[49]

In 1868, the term was used to describe the Midland Railway main route from North to South through Sheffield[50] and also on routes to Manchester, Leeds and Carlisle.

Under British Rail the term was used to define the route between St Pancras and Sheffield, but since then, Network Rail has restricted it in its description of Route 19[51] to the lines between St. Pancras and Chesterfield.

Accidents

Operators

East Midlands Railway Class 222 at Leicester
Thameslink Class 700

East Midlands Railway

The principal operator is East Midlands Railway, which operates four InterCity trains every hour from London St Pancras with two trains per hour to both Nottingham and Sheffield. EMR use Class 222 Meridian trains in various carriage formations for its InterCity services.

EMR also operate a twice hourly commuter service from London St Pancras to Corby, which is branded as EMR Connect, using Class 360 Desiro electric trains.[52]

Thameslink provides frequent, 24-hour[53] commuter services south of Bedford as part of its Thameslink route to London Bridge, Gatwick Airport, Brighton, and Sutton, using 8-car and 12-car electric Class 700 trains.[54]

Other operators

CrossCountry runs a hourly services between Derby and Sheffield on its route between the South West and North East, and half hourly services from Nottingham to Birmingham and one running through to Cardiff. Northern runs an hourly service from Leeds to Nottingham via Barnsley and Alfreton.

Other operators include TransPennine Express in the Sheffield area.

Route description

The cities, towns and villages served by the MML are listed below. Stations in bold have a high usage. This table includes the historical extensions to Manchester (where it linked to the West Coast Main Line) and Carlisle (via Leeds where it meets with the 'modern' East Coast Main Line).

Network Rail groups all lines in the East Midlands and the route north as far as Chesterfield and south to London as route 19. The actual line extends beyond this into routes 10 and 11.

London to Nottingham and Sheffield (Network Rail Route 19)

More information Station, Village/town/city and county ...

Tunnels, viaducts and major bridges

Major civil engineering structures on the Midland Main Line include the following.[55][56]

More information Railway Structure, Length ...

Line-side monitoring equipment

Line-side train monitoring equipment includes hot axle box detectors (HABD) and wheel impact load detectors (WILD) ‘Wheelchex’, these are located as follows.[56][58][55]

More information Name / Type, Line ...

Ambergate Junction to Manchester

The complex network of road and rail around Ambergate Junction, formerly where Manchester expresses left the mainline

For marketing and franchising, this is no longer considered part of the Midland Main Line: see Manchester, Buxton, Matlock and Midlands Junction Railway

The line was once the Midland Railway's route from London St Pancras to Manchester, branching at Ambergate Junction along the Manchester, Buxton, Matlock and Midlands Junction Railway, now known as the Derwent Valley line. In days gone by, it featured named expresses such as The Palatine. Much later in the twentieth century, it carried the Midland Pullman.

This line was closed in the 1960s between Matlock and Buxton, severing an important link between Manchester and the East Midlands, which has never been satisfactorily replaced by any mode of transport. A section of the route remains in the hands of the Peak Rail preservation group, operating between Matlock and Rowsley to the north.

Leeds to Carlisle

For marketing and franchising, this is no longer considered part of the Midland Main Line: see Settle–Carlisle Railway.

A geographical representation of the aborted Midland Main Line diversion through the West Riding, which would have put Bradford on a through line and provided a direct connection to Scotland. (Existing lines shown in black and the diversion in red).
Map showing the proposed Midland line into Bradford

World War I prevented the Midland Railway from finishing its direct route through the West Riding to join the Settle and Carlisle (which would have cut six miles from the journey and avoided the need for reversal at Leeds).

The first part of the Midland's West Riding extension from the main line at Royston (Yorks.) to Dewsbury was opened before the war. However, the second part of the extension was not completed. This involved a viaduct at Dewsbury over the River Calder, a tunnel under Dewsbury Moor and a new approach railway into Bradford from the south at a lower level than the existing railway (a good part of which was to be in tunnel) leading into Bradford Midland (or Bradford Forster Square) station.

The 500 yards (460 m) gap between the stations at Bradford still exists. Closing it today would also need to take into account the different levels between the two Bradford stations, a task made easier in the days of electric rather than steam traction, allowing for steeper gradients than possible at the time of the Midland's proposed extension.

Two impressive viaducts remain on the completed part of the line between Royston Junction and Dewsbury as a testament to the Midland's ambition to complete a third direct Anglo–Scottish route. The line served two goods stations and provided a route for occasional express passenger trains before its eventual closure in 1968.

The failure to complete this section ended the Midland's hopes of being a serious competitor on routes to Scotland and finally put beyond all doubt that Leeds, not Bradford, would be the West Riding's principal city. Midland trains to Scotland therefore continued to call at Leeds before travelling along the Aire Valley to the Settle and Carlisle. From Carlisle they then travelled onwards via either the Glasgow and South Western or Waverley Route. In days gone by the line enjoyed named expresses such as the Thames–Clyde Express and The Waverley.

Former stations

As with most railway lines in Britain, the route used to serve far more stations than it currently does (and consequently passes close to settlements that it no longer serves). Places that the current main line used to serve include

See also


Notes and references

Notes
  1. Quickly the Sheffield and Rotherham Railway ran its branch line to Sheffield Wicker
References
  1. "East Midlands RUS Loading Gauge". Network Rail. p. 55. Retrieved 21 August 2010.
  2. "Midland Main Line Upgrade". Network Rail. July 2022.
  3. "Integrated Rail Plan for the North and Midlands". Department for Transport. 22 March 2022.
  4. "The Railway between Nottingham and Derby". Stamford Mercury. British Newspaper Archive. 7 June 1839. Retrieved 5 July 2016.
  5. "Midland Counties Railway". Leicester Chronicle. British Newspaper Archive. 9 May 1840. Retrieved 5 July 2016.
  6. "A Midland Railway chronology>Incorporation and expansion". The Midland Railway Society. 1998. Archived from the original on 28 December 2008.
  7. UK Retail Price Index inflation figures are based on data from Clark, Gregory (2017). "The Annual RPI and Average Earnings for Britain, 1209 to Present (New Series)". MeasuringWorth. Retrieved 11 June 2022.
  8. Leleux, Robin. A Regional History of the Railways of Great Britain. Volume 9. David & Charles, Newton Abbot. p. 92. ISBN 0715371657.
  9. "Opening of the Leicester and Hitchin Line". Bedfordshire Mercury. British Newspaper Archive. 9 May 1857. Retrieved 5 July 2016.
  10. Davies, R.; Grant, M.D. (1984). Forgotten Railways: Chilterns and Cotswolds. Newton Abbot, Devon: David St John Thomas. ISBN 0-946537-07-0, p. 110–111.
  11. "A Midland Railway chronology>London extension". The Midland Railway Society. 1998. Archived from the original on 28 December 2008.
  12. Barnes, E. G. (1969). The Rise of the Midland Railway 1844–1874. Augustus M. Kelley, New York. p. 308.
  13. Radford, B., (1983) Midland Line Memories: a Pictorial History of the Midland Railway Main Line Between London (St Pancras) & Derby London: Bloomsbury Books
  14. The Railway Magazine. June 1958. p. 432. {{cite magazine}}: Missing or empty |title= (help)
  15. Railway Electrification. British Railways Board (Central Publicity Unit). Winter 1979. pp. 0–2, 8.
  16. "East Midlands Parkway – Our greenest station to open on 26 January" (Press release). East Midlands Trains. 14 January 2009.[dead link]
  17. "Midland Main Line celebrates at 125mph". Rail News. Retrieved 20 July 2017.
  18. "Midland Main Line / East Midlands Route Utilisation Strategy". Strategic Rail Authority. Retrieved 29 August 2008.
  19. "East Midlands Route Utilisation Strategy". Network Rail. February 2010. Retrieved 29 August 2008.
  20. "Midlands line 'to be electrified'". BBC News Online. 14 July 2012. Retrieved 14 July 2012. A £500m scheme … Transport Secretary Justine Greening is set to outline plans to complete the electrification of the route from Sheffield to London on Monday.
  21. Odell, Mark; Parker, George (13 July 2012). "Osborne backs £10bn rail plan". Financial Times. Archived from the original on 10 December 2022. Retrieved 14 July 2012. announcement, expected on Monday, is likely to include a £530m plan to complete electrification of the Midland mainline between Bedford and Sheffield
  22. "Working Group 4 – Electrification Strategy". Network Rail. Retrieved 27 September 2009.
  23. Barton, Tom (17 March 2014). "Developers taking too long to build homes, MP says". BBC News Online. Retrieved 21 March 2014.
  24. "Kettering East: Compromise deal agreed over funding". BBC News Online. 13 March 2013. Retrieved 21 March 2014.
  25. Broadbent, Steve (19 February 2014). "Switching on the Electric Spine". RAIL. No. 742. pp. 69–75.
  26. "Midland Main Line 2010 route plan" (PDF). Network Rail. 2010. Retrieved 8 November 2017.
  27. "Secretary of State opens Network Rail control centre" (Press release). Network Rail. Archived from the original on 26 September 2008. Retrieved 29 August 2008.
  28. "Plans for £150m station facelift". BBC News Online. London. 6 March 2008.
  29. Department for Transport (26 July 2011). "Access for all – stations". GOV.UK. Retrieved 11 April 2014.
  30. Rail Magazine. Issue 742. 19 February – 4 March. pp. 69–75.
  31. "Second Corby to Kettering railway track to be restored". BBC News Online. London. 6 February 2014.
  32. "Wellingborough railway station expansion plan unveiled". BBC News. 18 April 2012. Retrieved 23 August 2013.
  33. Brent Cross Cricklewood: Transport Archived 29 September 2013 at the Wayback Machine Retrieved 23 August 2013
  34. The Wixams: Transportation Archived 17 October 2015 at the Wayback Machine Retrieved 23 August 2013
  35. "Route Specifications 2015 – London North Eastern and East Midlands" (PDF). Network Rail. April 2015. Retrieved 10 August 2016.
  36. ATOC 2009, p. 19.
  37. Bedfordshire Ampthill station Archived 13 May 2008 at the Wayback Machine, Railway & Transport Association. Retrieved 4 January 2010.
  38. "Main works on next stage of Midland Main Line electrification due to begin". RailBusinessDaily. 21 December 2021. Retrieved 21 December 2021.
  39. Bradshaw, George (1848). Bradshaw's railway almanack, directory, shareholders' guide and manual. George Bradshaw. p. 204.
  40. "The Leeds and Bradford". Derby Mercury. British Newspaper Archive. 15 August 1849. Retrieved 10 August 2016 via British Newspaper Archive.
  41. "The New Works of the Midland Railway Company". Birmingham Journal. British Newspaper Archive. 21 December 1867. Retrieved 10 August 2016 via British Newspaper Archive.
  42. "The New Midland Railway Station at Sheffield". Sheffield Independent. 12 December 1868. Retrieved 10 August 2016 via British Newspaper Archive.
  43. "Route 19 Midland Main Line and East Midlands" (PDF). Archived from the original (PDF) on 15 September 2016. Retrieved 10 August 2016.
  44. Moran, Mark (24 May 2021). "EMR Connect launches all-electric Corby-St Pancras service". Transport Xtra. London: Landor LINKS. Retrieved 16 August 2021.
  45. "New cutting-edge trains in full operation across Thameslink route". mynewsdesk.com. Mynewsdesk. 18 September 2017. Retrieved 8 November 2017.
  46. Bridge, Mike (2013). Railway Track Diagrams Book 4 Midlands & North West. Bradford on Avon: Trackmaps. pp. 1–5. ISBN 978-0-9549866-7-4.
  47. Brailsford, Martyn (2016). Railway Track Diagrams Book 2: Eastern. Frome: Trackmaps. pp. 1, 27. ISBN 978-0-9549866-8-1.
KML is from Wikidata

Share this article:

This article uses material from the Wikipedia article Midland_Main_Line, and is written by contributors. Text is available under a CC BY-SA 4.0 International License; additional terms may apply. Images, videos and audio are available under their respective licenses.