Mahalakshmi_metro_station

Mahalakshmi metro station

Mahalakshmi metro station

Namma Metro's Green Line metro station


Mahalakshmi is an elevated metro station on the North-South corridor of the Green Line of Namma Metro serving Mahalakshmi Layout, ISKCON temple and surrounding areas in Bangalore, India. It was opened to the public on 1 March 2014.[1][2]

Quick Facts General information, Other names ...

Station layout

Mahalakshmi track layout
P1
P2
Station with two tracks and two side platforms
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Disabled access
Platform 2
Southbound
Towards → Silk Institute next station is Rajajinagar
Platform 1
Northbound
Towards ← Nagasandra next station is Sandal Soap Factory
Side platform | Doors will open on the left Disabled access
L2

Entry/Exits

There are 3 Entry/Exit points – A, B and C. Commuters can use either of the points for their travel.

  • Entry/Exit point A: Towards Srinivasa Temple side
  • Entry/Exit point B: Towards KG Ground side
  • Entry/Exit point C: Towards ISKCON Temple side

See also


References

  1. "Peenya-Sampige Road Metro Service From March 1". The New Indian Express. 25 February 2014. Archived from the original on 27 March 2014. Retrieved 27 March 2014.
  2. "'This one feels like Namma Metro as it's closer home'". The Hindu. 1 March 2014. Retrieved 27 March 2014.



Share this article:

This article uses material from the Wikipedia article Mahalakshmi_metro_station, and is written by contributors. Text is available under a CC BY-SA 4.0 International License; additional terms may apply. Images, videos and audio are available under their respective licenses.