Lori_1_Wind_Farm

Lori 1 Wind Farm

Lori 1 Wind Farm

Add article description


Lori 1 Wind Farm is a wind farm in Armenia located along the Bazum Mountains at Pushkin Pass in Lori, Armenia. The first wind farm in the country, it has four 660-kW wind turbines and has a capacity of 2.64 MWe.[1] Completed in December 2005 by the Iranian company Sunir with US$3.2 million funding from Iran, it is owned by the High-Voltage Electric Networks of Armenia.[1] In 2006, Lori 1 generated only 2.6 GWh of electricity (a yearly average of 296.8 KWe—about 11% of installed capacity).[2]

Quick Facts Country, Location ...

The Armenian and Iranian authorities have agreed to expand the wind farm up to 90 MW.[3]


References

  1. "Wind energy in Armenia: overview of potential and development perspectives" (PDF). US AID. March 2010. Archived from the original (PDF) on 2012-06-19. Retrieved 2012-12-23.
  2. PSRC-Q42006-Energy-Main-Indicators Archived 2011-05-31 at the Wayback Machine, Public Services Regulatory Commission of Armenia, 2007.]



Share this article:

This article uses material from the Wikipedia article Lori_1_Wind_Farm, and is written by contributors. Text is available under a CC BY-SA 4.0 International License; additional terms may apply. Images, videos and audio are available under their respective licenses.