List_of_longest_road_tunnels

List of longest road tunnels

List of longest road tunnels

Add article description


This page presents a list of the longest road tunnels of the world. This page lists all road tunnels longer than 5 km (3 mi).

World's longest road tunnels in use

More information Name, Location ...

Under construction

More information Name, Location ...

Timeline of world record lengths

More information Record, Name ...

See also

Notes

  1. Opened in stages between 2019 and 2023.
  2. 17.540 km + 17.485 km
  3. left tube 13,833 m, right tube 13,792 m
  4. Left tube 13,654 m; Right tube13,570 m
  5. left tube 13,433 m, right tube 13,381 m
  6. left tube 13,122 m, right tube: 13,098 m
  7. Tunnel section of KPE (8.13 km) and MCE (4.33 km) are contiguous, hence classified as one tunnel
  8. Dual carriageway 12 Lanes of traffic (maximum width: 70m) with each direction separated only by a full-height wall, thus considered to be one tube
  9. 12.290 km + 12.286 km
  10. left tube: 11,764m, right tube: 11,775m
  11. Left tube: 11,475m, Right tube: 11,520m, 1266m deep
  12. Left tube: 11,489m, Right tube: 11,456m
  13. left tube 11,408 m, right tube: 11,377 m
  14. segments 7.5 km (4.7 mi), 2.2 km (1.4 mi) and 1.7 km (1.1 mi)
  15. forked with roundabout and 3 segments
  16. left tube 11,200m, right tube 11,195 m
  17. the older tube 10,926 m
  18. second tube opened in 1991
  19. 10.965 km (Seoul bound, 10.962 km (Yangyang Bound)
  20. left tube: 10,497m, right tube: 10,485m
  21. left tube: 10,497m, right tube: 10,485m
  22. left tube 10,192 m, right tube 10,480 m
  23. the newer tube 10,173 m)
  24. second tube opened in 1995
  25. the older tube 9,755 m, the newer tube 10,085 m)
  26. second tube opened in 2004
  27. previous name is Daxiangling Tunnel
  28. 10.007 km + 9.962 km
  29. the two two-lane directions are superimposed (hence duplex) in one tube
  30. longest underground branch: W-E direction tube (Avenida de Portugal, M-30, Bypass sur)
  31. left tube 9,670 m, right tube 9,663 m
  32. left tube: 9,585m, right tube: 9,651m
  33. two subsea tubes (second 9,583 m)
  34. left tube 9,490 m, right tube 9,480 m
  35. left tube 9,252 m, right tube 9,198 m
  36. left tube: 9,228m, right tube: 9,215m
  37. 3 branches connecting in a Y-junction inside the tunnel
  38. previous name is Mayazi Tunnel
  39. left tube 8,985 m, right tube 9,007 m
  40. left tube 8,803 m, right tube 8,805 m
  41. left tube 8,803 m, right tube 8,776 m
  42. left tube 8,694 m, right tube 8,688 m
  43. previous name is Longtan Tunnel
  44. 8.693 km + 8.599 km
  45. Left tube: 8,640m, Right tube: 8,776m
  46. left tube 8,668 m, right tube 8,631 m
  47. second tube opened in 1985
  48. left tube 8,511 m, right tube 8,477 m
  49. left tube: 8,360m, right tube: 8,305m
  50. left tube 8,263 m, right tube 8,242 m
  51. left tube 8,262m, right tube 8,247m
  52. previous name is Mixiliang Tunnel
  53. Left tube: 7,930m, Right tube: 7,871m
  54. left tube 7,886 m, right tube 7,892 m
  55. Left tube: 7,654m, Right tube: 7,670m
  56. 7.605 km + 7.567 km
  57. 7.605 km + 7.536 km
  58. left tube 7,597m, right tube 7,560m
  59. left tube 7,548 m, right tube 7,531 m
  60. 7.540 km (Busan bound), 7.543 km (Pohang Bound)
  61. left tube: 7,525m, right tube: 7,527m
  62. left tube 7,524 m, right tube 7,493 m
  63. 7.353 km + 7.280 km
  64. left tube 7,246 m, right tube 7,223 m
  65. 7.190 km (Gijang bound), 7.087 km (Jinyeong Bound)
  66. in 1976 opened as road tunnel, in 1937 originally opened as rail tunnel
  67. left tube 6,848 m, right tube 6,868 m
  68. left tube 6,810 m, right tube 6,806 m
  69. left tube 6,795 m, right tube 6,785 m
  70. left tube 6,752 m, right tube 6,776 m
  71. previous name is Xizhouling Tunnel
  72. left tube 6,750 m, right tube 6,765 m
  73. 6.708 km + 6.693 km
  74. left tube: 6,685m, right tube: 6,640m
  75. 6.678 km + 6.676 km
  76. 6.656 km + 6.676 km
  77. 6.664 km + 6.663 km
  78. left tube: 6,618m, right tube: 6,592m
  79. left tube 6,515 m, right tube 6,570 m
  80. 6.557 km + 6.555 km
  81. both tubes 6.555 km
  82. left tube 6,521 m, right tube 6,551 m
  83. left tube: 6,521m, right tube: 6,537m
  84. left tube 6,410 m, right tube 6,440 m
  85. Left tube: 6,420m, Right tube: 6,380m
  86. the newer tube 6,392 m
  87. left tube 6,395 m, right tube 6,400 m
  88. left tube: 6,336m, right tube: 6,350m
  89. the newer tube 6,328 m
  90. left tube 6,314 m, right tube 6,333 m
  91. left tube 6,318 m, right tube 6,307 m
  92. left tube 6,308 m, right tube 6,280 m
  93. left tube 6,201 m, right tube 6,254 m
  94. left tube 6,142 m, right tube 6,187 m
  95. left tube: 6,185m, right tube: 6,130m
  96. left tube 6,125 m, right tube 6,145 m
  97. left tube 6,102 m, right tube 6,144 m
  98. 6.123 km + 6.115 km
  99. 6.105 km + 6.082 km
  100. left tube 6,015 m, right tube 6,058 m
  101. left tube 6,051 m, right tube 6,043 m
  102. left tube: 5,946.5m, right tube: 6,043.42m
  103. left tube: 6,010m, right tube: 6,020m
  104. left tube: 6,010m, right tube: 6,020m
  105. left tube: 5,910m, right tube: 6,010m
  106. left tube: 5,973m, right tube: 5,997m
  107. left tube 5,972 m, right tube 5,963 m
  108. left tube 5,874 m, right tube 5,898 m
  109. left tube 5,897 m, right tube 5,773.5 m
  110. left tube 5,850 m, right tube 5,837 m
  111. left tube 5,685 m, right tube 5,833 m
  112. left tube: 5804m right tube:5805m
  113. A subaqueous tunnel
  114. subsea
  115. left tube: 5754m right tube:5726m
  116. left tube: 5,727m, right tube: 5,720m; elevation: 4,750m
  117. left tube: 5,715m, right tube: 5,670m
  118. left tube: 5,715m, right tube: 5,670m
  119. left tube: 5,653m, right tube: 5,681m
  120. left tube: 5,656m, right tube: 5,677.3m
  121. left tube: 5,635m, right tube: 5,645m
  122. left tube: 5,627m, right tube: 5,628m
  123. left tube: 5,627m, right tube: 5,628m
  124. left tube: 5,568m, right tube: 5,580m
  125. left tube: 5,565m, right tube: 5,575m
  126. left tube: 5,535m, right tube: 5,520m
  127. left tube: 5,518m, right tube: 5,521m
  128. left tube: 5,518m, right tube: 5,510m
  129. left tube: 5,512m, right tube: 5,512m
  130. left tube: 5,450m, right tube: 5,510m
  131. left tube: 5,444m, right tube: 5,501m
  132. left tube: 5,412m, right tube: 5,493m
  133. left tube: 5,461m, right tube: 5,476m
  134. left tube: 5445m right tube:5450m
  135. left tube: 5431m right tube:5434m
  136. left tube: 5,408m, right tube: 5,385m
  137. left tube: 5,351m, right tube: 5,367m
  138. left tube: 5,347m, right tube: 5,264m
  139. left tube: 5,263m, right tube: 5,338m
  140. left tube: 5,273m, right tube: 5,333m
  141. left tube: 5,305m, right tube: 5,325m
  142. left tube: 5,215m, right tube: 5,300m
  143. left tube: 5,265m, right tube: 5,275m
  144. left tube: 5,270 m, right tube: 5,273 m
  145. left tube: 5,259m, right tube:5,255m
  146. left tube: 5,257m, right tube: 5,222m
  147. left tube: 5,160m, right tube:5,235m
  148. left tube: 5,107m, right tube: 5,228m
  149. left tube: 5,190m, right tube:5,225m
  150. left tube: 5,165m, right tube:5,180m
  151. left tube: 5,177m, right tube:5,160m
  152. left tube: 5,067m, right tube:5,143m
  153. left tube: 5,140m, right tube:5,108m
  154. left tube: 5,110m, right tube: 5,105m
  155. left tube: 5,068m, right tube: 5,106m
  156. left tube: 5085m right tube:5080m
  157. left tube: 5,053m, right tube: 5,053m
  158. left tube: 5,028m, right tube: 4,984m
  159. left tube: 5,000m, right tube: 5,024m
  160. left tube: 5,018m, right tube: 5,000m
  161. left tube: 5,014m, right tube: 5,015m
  162. left tube: 5,012m, right tube:4,998m
  163. left tube: 4,965m, right tube:5,000m
  164. left tube: 12,878m, right tube: 12,945m
  165. tunnel section of NSC are (10.4 km), while sub-surface section is (2.1km)
  166. left tube: 11,764m, right tube: 11,775m
  167. left tube: 11,300m, right tube: 11,335m
  168. Left tube: 10,983m, Right tube: 11,036m
  169. left tube: 10,990m, right tube: 11,000m
  170. left tube: 10,990m, right tube: 10,922m
  171. left tube: 10,990m, right tube: 10,922m
  172. left tube: 10,297m, right tube: 10,251m
  173. left tube: 10,235m, right tube: 10,210m
  174. left tube: 10,127m, right tube: 10,046m
  175. left tube: 9,857m, right tube: 9,878m
  176. left tube: 9,753m, right tube: 9,752m
  177. Left tube: 8,865m, Right tube: 8,780m
  178. left tube: 8,360m, right tube: 8,355m
  179. left tube: 8,360m, right tube: 8,305m
  180. left tube 7,503 m, right tube 7,537 m
  181. left tube: 7,066m, right tube: 7,032m
  182. left tube: 6,930m, right tube: 6,887m
  183. Left tube: 6,772m, Right tube: 6,655m
  184. left tube: 6,284m, right tube: 6,328m
  185. left tube: 6,044m, right tube: 5,943m; elevation: 3,500m
  186. 1 tube + 1 service tube 5,490 m)
  187. Elevation: >3,300m

References

  1. "WestConnex M4-M5". Acciona. Retrieved 12 April 2024.
  2. "WestConnex M4". Westconnex. Retrieved 12 April 2024.
  3. "WestConnex M8". Westconnex. Retrieved 12 April 2024.
  4. "The Rozelle Interchange Project Factsheet" (PDF). Westconnex. Retrieved 12 April 2024.
  5. "Rozelle Interchange Driver Animations". caportal.com.au. Retrieved 2023-11-26.
  6. 锦屏水电枢纽工程锦屏山隧道 (in Chinese). Archived from the original on October 7, 2013. Retrieved February 17, 2014.
  7. "巴陕高速米仓山特长隧道开工-四川日报网". Economy.scdaily.cn. Retrieved 2016-02-01.
  8. "太古高速公路正式通车 西山特长隧道长度为全省第一全国第二". Archived from the original on 22 September 2013. Retrieved 30 September 2014.
  9. "狮子坪隧道可跑了!今天中午12点,汶马高速通车! - 川观新闻". cbgc.scol.com.cn (in Simplified Chinese). Retrieved 2021-02-07.
  10. "[山西]长平高速公路正式运营". Archived from the original on 16 December 2013. Retrieved 30 September 2014.
  11. "Sandoyartunnilin". Faroese Government. Retrieved 21 December 2023.
  12. "Toven tunnel holing imminent - tunnelbuilder.com News". Tunnelbuilder.com. 2012-01-23. Retrieved 2016-02-01.
  13. "Wegenwiki: Baotashan Tunnel". Retrieved 30 September 2014.
  14. "山西省交通运输厅". Archived from the original on 6 October 2014. Retrieved 30 September 2014.
  15. Ashiq, Peerzada (2017-04-02). "Swap terrorism for tourism, Modi tells Kashmiri youth". The Hindu.
  16. 重庆市政府网站 (2021-01-26). "万开快速通道临时通车". news.sina.com.cn. Retrieved 2021-01-26.
  17. News, Indian Defence (3 October 2020). "9-km-long Atal Tunnel an engineering marvel". Indian Defense News, Indian Armed Forces, IDRW, Defence. Retrieved 2020-10-04. {{cite web}}: |last= has generic name (help)
  18. "上海长江隧桥通车_新浪上海_新浪网". Sh.sina.com.cn. 2009-10-16. Retrieved 2016-02-01.
  19. "错误信息". www.cr20g.com. Archived from the original on March 16, 2014.
  20. "赣鄂隧道快速施工的关键技术". Retrieved 30 September 2014.
  21. "张涿高速公路张家口段顺利通车" (in Chinese). Archived from the original on 2014-01-07.
  22. "单洞全长13716米的永古高速安远隧道全线贯通". Archived from the original on 21 June 2013. Retrieved 30 September 2014.
  23. "人民网". Archived from the original on 16 March 2014. Retrieved 30 September 2014.
  24. "承(德)赤(峰)高速茅荆坝隧道全线贯通". Archived from the original on May 22, 2013. Retrieved 30 September 2014.
  25. "武警交通部队参与建设华北最长高速公路隧道通车". Archived from the original on December 28, 2013. Retrieved 30 September 2014.
  26. 蓝涛 陈莹莹. "云景高速西周岭隧道贯通". Archived from the original on 6 October 2014. Retrieved 30 September 2014.
  27. "云景高速昨晚八时正式通车--新闻". Archived from the original on 2014-10-06. Retrieved 30 September 2014.
  28. "大丰华高速一期今日正式通车_建设". www.sohu.com. Retrieved 2021-06-29.
  29. "Abre-se o túnel do Marão, quebra-se a "barreira psicológica"" (in Portuguese). Publico newspaper. Retrieved 7 May 2016.
  30. "遵秦高速鹁塘沟特长隧道右洞贯通". jtt.hebei.gov.cn. Retrieved 2022-06-24.
  31. 网易 (2018-07-02). "渝黔高速尧龙山隧道正式进洞施工". chongqing.163.com. Retrieved 2022-06-24.
  32. "Shahriston tunnel expected to be commissioned this month". archive.is. 23 July 2013. Archived from the original on 23 July 2013.
  33. "索古修寨隧道双线贯通 _ 东方财富网". finance.eastmoney.com. Retrieved 2022-06-24.
  34. "E39 Rogfast - Statens Vegvesen". Vegvesen.no. 2017-05-23. Retrieved 2017-07-07.
  35. "Tianshan Shengli Tunnel - Wegenwiki". www.wegenwiki.nl. Retrieved 2020-07-06.
  36. "E4 Förbifart Stockholm - Trafikverket". Trafikverket.se. 2015-09-25. Retrieved 2016-02-01.
  37. 经济日报 (2020-03-09). "乐山至西昌高速公路大凉山1号隧道开建". news.sina.com.cn. Retrieved 2020-10-07.
  38. "隧道工程的"禁区"木寨岭再攻坚-新华网". www.xinhuanet.com. Archived from the original on March 25, 2019. Retrieved 2020-07-06.
  39. "Work On Zojila Pass Tunnel In J&K To Commence On August 15, NHIDCL Says". Bloombergquint.com. 5 June 2017. Retrieved 24 February 2018.
  40. Tiempo, Casa Editorial El (25 May 2015). "Así será el Túnel del Toyo: el más largo y costoso que hará el país". El Tiempo.
  41. "吕梁石楼县汾石高速东山特长隧道开工". sx.people.com.cn. Retrieved 2022-05-15.
  42. The Slovak Spectator (2019-03-07). "The current constructor of the Višňové tunnel will not complete it". spectator.sme.sk. Retrieved 2019-08-17.
  43. 新疆949交通广播 (2022-05-23). "新进展!进洞施工!". k.sina.cn. Retrieved 2022-06-18.{{cite web}}: CS1 maint: numeric names: authors list (link)
  44. MLIT Hokkaido Regional Development Bureau (2023-01-17). "北海道縦貫自動車道 七飯-大沼 再評価原案準備書説明資料" (PDF). hkd.mlit.go.jp. Retrieved 2023-06-17.
  45. MLIT Hokkaido Regional Development Bureau (2023-01-17). "北海道縦貫自動車道 七飯-大沼 費用便益分析バックデータ" (PDF). hkd.mlit.go.jp. Retrieved 2023-06-17.
  46. 网易 (2021-09-11). "半小时!广邻、广武快速通道最新进展来了". www.163.com. Retrieved 2022-06-18.
  47. "Tunnel Hranjen, Goražde, Bosnia and Herzegovina". Klix.ba. 2019-10-11. Retrieved 2019-10-12.
  48. 网易 (2022-03-18). "昌保高速昌宁隧道左右线工程完成过半". www.163.com. Retrieved 2022-06-24.
  49. 网易 (2020-09-25). "景泰至礼县高速公路陇南段礼县隧道顺利进洞施工". www.163.com. Retrieved 2022-06-24.

Share this article:

This article uses material from the Wikipedia article List_of_longest_road_tunnels, and is written by contributors. Text is available under a CC BY-SA 4.0 International License; additional terms may apply. Images, videos and audio are available under their respective licenses.