List_of_bridges_and_tunnels_in_Dubai

List of bridges and tunnels in Dubai

List of bridges and tunnels in Dubai

Add article description


These are the bridges in Dubai that are completed, under construction, proposed or approved.

Operation

Bridges in Dubai are operated by Dubai Roads and Transport Authority (RTA).

List of completed bridges

BridgeOpenedLength (m)CostNumber of lanesVehicles per hour
Al Maktoum Bridge19639,500
Floating Bridge, Dubai16 July 2007300 meters155 million dirhams126,000
Al Garhoud Bridge1976520 metres415 million dirhams69,000
Business Bay CrossingJune 20071.6 km800 million dirhams1326,000
Infinity Bridge(Al Shindagha Bridge)16 January 2022295 metres393 million dirhams1224,000

List of bridges under construction or Approved

BridgeExpected completionLength (m)CostNumber of lanesVehicles per hour
Sheikh Rashid bin Saeed Crossing20121.6 km2.5 billion dirhams129,500
Dubai Smile2018300 meters810 million dirhams1224,000
The Fifth Bridge[A][1]2.5 billion dirhams12
Notes
A. ^ Approved for construction.

All of tunnels in The United Arab Emirates

BridgeOpenedLength (m)CostNumber of lanesVehicles per hour
Al Shindagha Tunnel1975550

Meters

394 Million

Dhs

415,000 vehicles per hour
Dubai Airport tunnelConstructed during the mid 2000s, goes under Dubai Airport1500

Meters

686 Million Dhs61,650 vehicles

Per hour

Palm Jumeirah tunnel2006[2]750 metre[3]63,000 vehicles

per hour

See also


References

  1. "Floating Bridge will stay till 2014 | Transport – Gulf News". 6 November 2009.

Share this article:

This article uses material from the Wikipedia article List_of_bridges_and_tunnels_in_Dubai, and is written by contributors. Text is available under a CC BY-SA 4.0 International License; additional terms may apply. Images, videos and audio are available under their respective licenses.