Line_2_(Zhengzhou_Metro)

Line 2 (Zhengzhou Metro)

Line 2 (Zhengzhou Metro)

Metro line in Zhengzhou, China


Line 2 of the Zhengzhou Metro (Chinese: 郑州地铁二号线; pinyin: Zhèngzhōu Dìtiě Èr Hào Xiàn) is a rapid transit line running from north to south of Zhengzhou. It opened on 19 August 2016. The line is currently 30.9 km long with 22 stations.[3][1][2]

Quick Facts Overview, Status ...

Through services are operated on Line 2 and Chengjiao line (part of future Line 9), although they are classified as separate lines.[4]

Map of Zhengzhou Metro Line 2

History

Interior of a train on Line 2

The first phase of the line began construction on 28 December 2010, and began operations on 19 August 2016.[5] The second phase of the line began operations on 28 December 2019.

Opening timeline

More information Segment, Commencement ...

Stations

More information Station №, Station name ...

References

  1. "郑州地铁2号线19日开通 1、2号线换乘攻略". 2016-08-18.
  2. "郑州地铁2号线8月10日起开始试乘" (in Chinese). Xinhua. Archived from the original on January 18, 2017. Retrieved 18 January 2017.
  3. "郑州地铁2号线将与城郊铁路实行大小交路套跑运行" (in Chinese). Xinhua. Retrieved 18 January 2017.
  4. "郑州双地铁时代来了!". 河南分网. Retrieved 30 December 2017.



Share this article:

This article uses material from the Wikipedia article Line_2_(Zhengzhou_Metro), and is written by contributors. Text is available under a CC BY-SA 4.0 International License; additional terms may apply. Images, videos and audio are available under their respective licenses.