Line 2 (Sistema de Tren Eléctrico Urbano)

Line 2 (Sistema de Tren Eléctrico Urbano)

Add article description


Line 2 of the Guadalajara Urban Electric Train System is the second line built to optimise public transport by urban rail. It was constructed between January 1992 and June 1994. Its building cost was much higher than that of Line 1 because there was no existing infrastructure as was the case during Line 1's construction, and also because it involved the modification of drainage collectors in order to build new underground infrastructure.[2]

Line 2
Last extension July 1, 1994
Rolling stock TLG-88, TEG-90
Platforms 150 m (492 ft 2 in)
Quick Facts Overview, Owner ...

The inauguration of this line took place on July 1, 1994 and was headed by the then Governor of Jalisco Carlos Rivera Aceves (interim) and by the then President of Mexico Carlos Salinas de Gortari. Of the three existing lines, this is the shortest in the network and it is coloured green.

Line stations

More information Logo, Name ...

References

  1. "SITEUR | Sistema de Tren Eléctrico Urbano". www.siteur.gob.mx (in Spanish). Archived from the original on 2016-08-16. Retrieved 2018-11-30.
  2. Portal. "Origen del SITEUR". Retrieved 2017-01-07.

    Share this article:

    This article uses material from the Wikipedia article Line_2_(Sistema_de_Tren_Eléctrico_Urbano), and is written by contributors. Text is available under a CC BY-SA 4.0 International License; additional terms may apply. Images, videos and audio are available under their respective licenses.