Kudlu_Gate_metro_station

Kudlu Gate metro station

Kudlu Gate metro station

Upcoming Namma Metro station under Yellow Line


Kudlu Gate is an upcoming elevated metro station on the North-South corridor of the Yellow Line of Namma Metro in Bangalore, India.

Quick Facts General information, Location ...

As per latest reports, the Yellow Line is stated to be operational around November 2024 due to the upcoming Indian general election which will occur during April–May 2024 and lots of trial runs along with more trainsets are required for commencement of operations. [1][2][3][4][5]

Station layout

Station Layout (TBC)

Kudlu Gate track layout (TBC)
P1
P2
Station with two tracks and two side platforms
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Disabled access
Platform 2
Southbound
Towards → Bommasandra next station is Singasandra
Platform 1
Northbound
Towards ← Central Silk Board / Rashtreeya Vidyalaya Road next station is Hongasandra
Side platform | Doors will open on the left Disabled access
L2

Entry/Exits

See also


References

  1. "Bengaluru Metro's Yellow Line to Open in November 2024, Tejasvi Surya Shares Key Details". TimesNow. 9 March 2024. Retrieved 10 March 2024.
  2. DHNS. "Bengaluru metro's Yellow Line to start only after general elections". Deccan Herald. Retrieved 14 December 2023.
  3. "RV Road-Bommasandra Metro stretch to open by April: CM Siddaramaiah". The New Indian Express. Retrieved 11 November 2023.
  4. "Metro Yellow Line to E-City & extended Green Line to open by April 2024: CM Siddramaiah". The Times of India. 21 October 2023. ISSN 0971-8257. Retrieved 11 November 2023.

Share this article: