Krishnarajapura_metro_station

Krishnarajapura metro station

Krishnarajapura metro station

Namma Metro's Purple & Blue Line interchange station


Krishnarajapura (abbreviated as K.R. Pura) is an important elevated metro station on the East-West corridor of the Purple Line as well as the South-North corridor of the upcoming Blue Line of Namma Metro in Bengaluru, India.[1] This will be an upcoming interchange metro station after Nadaprabhu Kempegowda Stn., Majestic having interchange with Purple and Green Lines. Around this station, holds the main KR Puram Railway station followed by some locations like KR Pura Hanging Bridge leading towards Hoskote, Tin Factory, ITI General Hospital and many more.[2][3] This station under Blue Line[4] is planned to be operational around the year 2026 (TBC).[5]

Quick Facts General information, Other names ...

The Whitefield - Krishnarajapura trial runs were successfully conducted (under Purple Line) from 25 October for a month.[6] This metro station (under Purple Line) was inaugurated on March 25, 2023 by Prime Minister Narendra Modi and was commenced to the public on March 26, 2023.[7][8][9][10][11][12]

Station layout

Purple Line - Station Layout

Krishnarajapura track layout
P2
P1
Station with two tracks and two side platforms
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Disabled access
Platform 1
Eastbound
Towards → Whitefield (Kadugodi) next station is Singayyanapalya
Platform 2
Westbound
Towards ← Challaghatta next station is Benniganahalli
Side platform | Doors will open on the left Disabled access
L2

Blue Line - Station Layout - To Be Confirmed

Krishnarajapura track layout
P#
P#
Station with two tracks and two side platforms
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Disabled access
Platform #
Eastbound
Towards → Central Silk Board next station is Sarasvathi Nagar
Platform #
Westbound
Towards ← KIAL Terminals next station is Kasturi Nagar
Side platform | Doors will open on the left Disabled access
L2

Timeline

Connections

This metro station is connected with Krishnarajapuram of Indian Railways network.

Entry/Exit

There are 2 Entry/Exit points - A and B. Commuters can use either of the points for their travel.

  • Entry/Exit point A - Towards KR Pura Railway Station side
  • Entry/Exit point B - Towards Whitefield Main Road side

See also


References

  1. "Whitefield metro line: Ahead of inauguration, names of six stations changed".
  2. "Baiyappanahalli-Whitefield Metro stretch to have 13 stops". The New Indian Express. Retrieved 21 June 2022.
  3. Rustagi, Abha (5 May 2022). "Baiyappanahalli-Whitefield Line to be functional from Dec 2022". Metro Rail News. Retrieved 21 June 2022.
  4. Philip, Christin Mathew (28 November 2022). "Bangalore Metro Rail Corporation Limited plans combined station for 2 lines at Iblur". The Times of India. Retrieved 28 November 2022.
  5. "Baiyappanahalli-Whitefield metro line trial from October 25". Deccan Herald. 5 October 2022. Retrieved 6 October 2022.
  6. "Metro finally comes to Whitefield, take a ride on March 26 from 7 am!". Deccan Herald. 26 March 2023. Retrieved 26 March 2023.
  7. Bureau, The Hindu (3 February 2023). "Namma Metro train between K.R. Puram and Whitefield to run at frequency of 10 minutes". The Hindu. ISSN 0971-751X. Retrieved 3 February 2023.
  8. "BMRCL to zoom metro from KR Puram to Whiefield in 22 minutes". The New Indian Express. Archived from the original on 2 March 2023. Retrieved 2 March 2023.



Share this article:

This article uses material from the Wikipedia article Krishnarajapura_metro_station, and is written by contributors. Text is available under a CC BY-SA 4.0 International License; additional terms may apply. Images, videos and audio are available under their respective licenses.