Kangy Angy Maintenance Centre

Kangy Angy Maintenance Centre

Add article description


The Kangy Angy Maintenance Centre is a railway depot at Kangy Angy on the Central Coast, New South Wales to maintain the NSW TrainLink D sets. The depot was officially opened on 24 February 2021.

Quick Facts Location, Coordinates ...

The depot is almost 500,000 square metres (5,400,000 sq ft) in size and has about 6 kilometres (3.7 mi) of electric rail lines. It runs 24/7 and is operated by UGL Rail under a 15-year contract.

History

In 2017, Transport for NSW awarded a contract to John Holland to build a new depot adjacent to the Main Northern line at Kangy Angy to maintain the NSW TrainLink D sets.[1] Construction commenced in May 2018 with the depot.[2][3]

Major construction was completed in 2020 and the first D set arrived at the facility in October 2020.[4] The facility was officially opened on 24 February 2021.[5]


References

  1. First sod turned on Kangy Angy train maintenance facility Railway Digest July 2018 page 7
  2. "Kangy Angy welcomes first New Intercity Fleet train". Transport for NSW. 8 October 2020. Retrieved 9 October 2020.
  3. "New Rail Maintenance Facility Officially Open". Transport for NSW. 24 February 2021. Retrieved 1 March 2021.