Jiaxing Tram (Chinese:嘉兴有轨电车) is a tram in Jiaxing, Zhejiang Province, China. There are seven lines planned for construction, which will span a length of about 98 kilometres (61mi).[1]
You can help expand this article with text translated from the corresponding article in Chinese. (July 2021) Click [show] for important translation instructions.
Machine translation, like DeepL or Google Translate, is a useful starting point for translations, but translators must revise errors as necessary and confirm that the translation is accurate, rather than simply copy-pasting machine-translated text into the English Wikipedia.
Do not translate text that appears unreliable or low-quality. If possible, verify the text with references provided in the foreign-language article.
You must provide copyright attribution in the edit summary accompanying your translation by providing an interlanguage link to the source of your translation. A model attribution edit summary is Content in this edit is translated from the existing Chinese Wikipedia article at [[:zh:嘉兴有轨电车]]; see its history for attribution.
You may also add the template {{Translated|zh|嘉兴有轨电车}} to the talk page.
Jiaxing first disclosed the rail plan in 2015.[2] On 16 September 2019, the Jiaxing Municipal People's Government approved the construction plan of the tram for 2019–2023.[3] The plan was also approved by the Zhejiang Provincial Development and Reform Commission on 9 December 2019, and the preliminary design of the first phase of the project was approved on 17 April 2020 by the same commission.[4]
On 28 December 2019, the tram started construction at the hub of the Jiaxing railway station,[5] and construction of the whole line of the first phase began in May 2020.[6]
On 5 November 2020, the first box substation of the first phase was moved to basis, and the leveling, installation, and connection of the equipment was completed.[7] On the 14th of the same month, the first set of turnouts began to be laid.[8] On the 17th, the platform design plan was released.[9] On the afternoon of 11 December, the beam and slab erection of the first bridge of the T1 line was completed. This marked that the rail laying construction of the first phase had entered a comprehensive stage.[10] In the same month, the Operations Control Center (OCC) completed the structural capping.[11] In January 2021, the subgrade pile foundation of the first phase was completed.[12]
The first phase, a 10.6 kilometres (6.6mi) long stretch from Jiaxing South railway station to Fanggong Road Binhe Road stop (Chinese:纺工路滨河路站), opened on 25 June 2021.[13] From opening until 7 October 2021, passengers could travel for free.[14] It extended for 1 station (0.6 kilometres (0.37mi)) to Jiaxing railway station on 15 January 2022.[15]
This article uses material from the Wikipedia article Jiaxing_Tram, and is written by contributors.