Calcutta_Chord_link_line

Calcutta Chord link line

Calcutta Chord link line

Suburban railway system in Kolkata


The Calcutta Chord link line, also known as the C.C. link line, is a 22 km (14 mi) long branch line of the Kolkata Suburban Railway which comes under the jurisdiction of Eastern Railway's Sealdah Division & Howrah Division.[1][2]

Quick Facts Calcutta Chord link line (incl. A.C.C. link branch line), Overview ...

The line directly connects the Sealdah railway station (erstwhile Calcutta railway station) on the east bank of the Hooghly River with the Howrah–Bardhaman chord line at the Dankuni Junction on the west bank of the Hooghly River via the Vivekananda Setu. The Andul Calcutta Chord link branch line (known as the A.C.C.L. branch line) is a 9 km (5.6 mi) long branch line from Dankuni Junction which connects C.C. link line with the Santragachi–Amta branch line and Andul on the Howrah–Kharagpur line.[1][2][3]

Services

The C.C link line serves as a vital link for the city of Kolkata to the rest of the country providing a shorter route through the Howrah–Bardhaman chord line rather than the longer route through the Howrah-Bardhaman main line via the Naihati–Bandel branch line.[1][2] The line is used by major long distance express services such as the Sealdah Rajdhani Express, Darjeeling Mail, Padatik Express, and Ananya Express amongst many others, originating from the Sealdah and Kolkata railway stations, to the rest of India. The line is also a part of the Kolkata Suburban Railway and is served by 46 Daily and 40 Sunday EMU services running between Sealdah and Dankuni and 2 EMU services between Sealdah and Baruipara.[4][5] These suburban services are provided by 9-car EMU rakes from the Narkeldanga EMU Carshed.[6]

The line also acts as an important link for freight commodities coming in and out of the Kolkata Port connecting it with the rest of the country. The A.C.C.L branch line was primarily built and used for diverting freight trains of the South Eastern Railway from the Howrah–Kharagpur line towards Chitpur and Kolkata docks.[7] With increasing public demand, some long-distance passenger trains were started in this section directly from Sealdah to connect to the Howrah–Kharagpur line, like the Sealdah–Puri Duronto Express.[8] More recently the line has been used by many long distance passenger trains such as the Kaziranga Express, Aronai Express and others from the Howrah–Kharagpur line to completely bypass the congested sections near Howrah while using Dankuni or Bhattanagar stations as commercial stoppages instead.[9][10][11]

History

The Howrah-Bardhaman Chord, a shorter link to Bardhaman from Howrah than the Howrah-Bardhaman Main Line, was constructed in 1917. In 1932, the Calcutta Chord Link Line was built over the Willingdon Bridge (now known as Vivekananda Setu) joining Dum Dum with Dankuni and opened for freight traffic, thus forming a direct link from Calcutta (now known as Sealdah railway station) to Dankuni on the Howrah-Bardhaman Chord, thus earning the line its name.[12][13]

By 1950–51, Santragachi was heavily congested causing delays in arrival for trains bound to Howrah.[7] Two major reasons identified for the congestion were its railway yard outstripping its capacity and passing of freight trains of the South Eastern Railway from Kharagpur towards Chitpur and Kolkata docks taking the circuitous route via Tikiapara, Liluah, Belanagar and then finally taking the Calcutta Chord link line to Calcutta.[7]

To resolve the congestion problem, Indian Railways sanctioned the remodeling of the Santragachi railway yard in November 1962 and sanctioned the building of a direct link from Andul on the Howrah–Kharagpur line to the Calcutta Chord link line in the railway budget of 1959–60. This was to reduce the distance between Andul and the Calcutta Chord from 27.5 km (17.1 mi) to 13 km (8.1 mi).[7]

The work of building the line however progressed slowly due to land acquisition problems and was finally completed in December 1968.[7] The electrification of the line was started subsequently and was completed by 1971–72.[14][15]

The ACCL branch line was primarily used by freight trains to bypass the congested sections near Howrah and directly connected the Eastern railway and South Eastern railway zones. However, with increasing public demand, some long-distance passenger trains were started in this section directly from Sealdah like the Sealdah–Puri Duronto Express in 2012.[8]

Tracks and electrification

The Dum Dum-Dankuni section was electrified in 1964–65. The Andul-Dankuni section was electrified in 1971–72.[15]

The doubling of the Dankuni-Bhattanagar section of the ACCL line was sanctioned on 2013.[16] The track doubling of the Andul–Baltikuri section was completed & commissioned on 25 January 2020.[17] With the completion of the track doubling of Baltikuri–Bhattanagar section in October 2021, the entire ACCL branch line was doubled. This removed a critical bottleneck affecting interchange of trains between Eastern Railway and South Eastern Railway.[18]

Routes and stations

More information #, Distance from Sealdah Main and North (km) ...
More information Andul Calcutta Chord Link branch line (ACCL branch line), # ...

References

  1. "Howrah Division System Map" (PDF). Archived (PDF) from the original on 10 July 2021. Retrieved 11 November 2021.
  2. "Sealdah Division System Map" (PDF). Archived (PDF) from the original on 27 May 2021. Retrieved 11 November 2021.
  3. "Kharagpur Division System Map". Archived from the original on 11 November 2021. Retrieved 11 November 2021.
  4. "Details of Operating Department: Sealdah Division, Eastern Railway". Archived from the original on 30 May 2011. Retrieved 30 November 2021.
  5. "Operating Department - Howrah Railway division, Eastern Railway". Eastern Railway. Archived from the original on 17 April 2021. Retrieved 4 March 2022.
  6. "Highlights of TRS Organisation, Sealdah division, Eastern Railway". Archived from the original on 19 April 2020. Retrieved 30 November 2021.
  7. "Estimates Committee - Ninety First Report (Third Lok Sabha) - Ministry of Railways - South Eastern Railway" (PDF). Archived (PDF) from the original on 11 November 2021. Retrieved 11 November 2021.
  8. "SEALDAH-PURI DURONTO TO BE INTRDUCED". Archived from the original on 22 May 2014. Retrieved 21 October 2021.
  9. "ECoR to run Holi special trains between Kolkata, Puri". Odisha News, Odisha Latest news, Odisha Daily - OrissaPOST. 12 March 2019. Retrieved 4 March 2022.
  10. "HOWRAH DIVISION : HISTORICAL PERSPECTIVE - THE FIRST JOURNEY". Archived from the original on 19 April 2020. Retrieved 21 October 2021.
  11. "Speech of Dr. Ram Subhag Singh Introducing Railway Budget for 1969-70, on 19th February, 1969" (PDF). Archived (PDF) from the original on 15 April 2015. Retrieved 11 November 2021.
  12. "History of Electrification". Archived from the original on 6 May 2006. Retrieved 21 October 2021.
  13. New Projects of Eastern Railway, Eastern Railway, 10 December 2018
  14. "South Eastern Railway PROGRESS OF WORKS UNDER DEMAND 16 (As of May'21)" (PDF). Archived (PDF) from the original on 11 November 2021. Retrieved 11 November 2021.
  15. "ER commissions doubling of Bhattanagar -Baltikuri section". Archived from the original on 28 October 2021. Retrieved 7 November 2021.
  16. "Category of stations - Eastern Railway" (PDF). Archived (PDF) from the original on 24 December 2021. Retrieved 24 December 2021.

Share this article:

This article uses material from the Wikipedia article Calcutta_Chord_link_line, and is written by contributors. Text is available under a CC BY-SA 4.0 International License; additional terms may apply. Images, videos and audio are available under their respective licenses.