Lhasa–Nyingchi_Railway

Lhasa–Nyingchi railway

Lhasa–Nyingchi railway

Add article description


The Lhasa–Nyingchi railway (Chinese: 拉林铁路) also known as the Lalin Line (Chinese: 拉林线), is a single-track railway across the southeast Tibet, China, linking Lhasa and Nyingchi.[1][2] It has a length of 435.48-kilometre (270.59 mi) and a designed speed of 160-kilometre (99 mi) per hour.[3][4] The trains have been equipped with oxygen supply equipment. There are currently nine stations in the cities of Lhasa, Shannan, and Nyingchi that can handle both passengers and freight transportation.[5]

Quick Facts Overview, Other name(s) ...

Construction

Located in a valley between Gangdis and Himalayas in southeast Tibet, over 90% of the tracks are at an elevation of more than 3,000-metre (9,800 ft) above sea level.[6] The railway crosses the Yarlung Tsangpo River 16 times and has 47 tunnels and 121 bridges.[7] It is part of the under-construction Sichuan–Tibet railway that will connect Lhasa and Chengdu, capital of the neighboring Sichuan province.[8] Lhasa-Nyingchi railway is the first fully-electrified railway in Tibet region.[9][10] The rolling stock is the China Railway CR200J Fuxing series powered by both electronic motors and internal combustion engines, marking the complete coverage of Fuxing series to all provincial-level regions in China.[11] The newly opened train route provides Nyingchi with access to railway services for the first time in history.[12]

History

On 4 November 2014, the National Development and Reform Commission approved the construction of Lhasa–Nyingchi railway.[13] The Sangzhuling Tunnel (桑珠岭隧道) started engineering works on 19 December 2014.[14] Construction began on 28 June 2015, and the track-laying work was completed by the end of 2020.[8]

On 25 June 2021, the railway began operation, with the first train leaving Lhasa for Nyingchi at 10.30 am. Compared with roads, the railway reduces the travel time from Lhasa to Nyingchi from 5 hours to 3.5 hours, and cuts the travel time from Shannan to Nyingchi from 6 hours to more than 2 hours.[2]

Rolling stock

160 km/h services use the China Railway CR200J trainsets.[15] CR200J Plateau variant will serve the railway, and it's a type of bi-mode locomotive specifically designed for plateau operations.[16] 31 sets of train in 12 car configuration is in service. A combination of diffusion and distributed oxygen systems are installed to help alleviate altitude sickness for passengers on the trip.[10]

Stations

More information English name, Tibetan name ...

See also


References

  1. "China will soon open a new stretch of rail across Tibet". The Economist. 5 June 2021. Retrieved 27 June 2021.
  2. Liu Xinyong; Norbu Tsering; Zhai Yongguan (25 June 2021). "Bullet train debuts on new railway in Tibet". China Xinhua News. Retrieved 27 June 2021.
  3. "拉林铁路山南段五座站房整体亮相". 2021-05-06. Archived from the original on 2021-05-26. Retrieved 2021-06-24.
  4. Liu Hongming (刘洪明); Liu Xinyong (柳新勇); Zhang Zhaoji (张兆基) (26 June 2021). 既“高”又“快”:拉林铁路建成记. China Xinhua News (in Chinese). Retrieved 28 June 2021.
  5. Jiao Peng (焦鹏) (26 June 2021). 受中国速度!踏上西藏首趟复兴号列车“绿巨人”. China Xinhua News (in Chinese). Retrieved 28 June 2021.
  6. "Lhasa-Nyingchi railway in Tibet to start operation Friday". China Daily. 25 June 2021. Retrieved 27 June 2021.
  7. "Tibet railway among new lines to open in China". international rail journal. 28 June 2021.
  8. Li Tong (李桐) (26 June 2021). 西藏首条电气化铁路建成通车 复兴号实现31个省份全覆盖. sina (in Chinese). Retrieved 28 June 2021.
  9. Chen Qin (陈琴); Pubu Ciren (普布次仁) (25 June 2021). 西藏第一条电气化铁路拉林铁路今天开通 沿线车站“一站一景”. CCTV (in Chinese). Retrieved 28 June 2021.
  10. Zhang Shaohu (张少虎) (4 November 2014). 拉林铁路有望年内开工:拉萨到林芝仅2小时. China Daily (in Chinese). Retrieved 27 June 2021.
  11. Wang Jun (王军) (13 April 2017). “冰火”两重天--国家重点项目川藏铁路拉林段施工现场见闻. China Xinhua News (in Chinese). Retrieved 27 June 2021.
  12. Morant, Sue (August 16, 2017). "Bridging the Sichuan-Tibet gap". International Railway Journal.

Share this article:

This article uses material from the Wikipedia article Lhasa–Nyingchi_Railway, and is written by contributors. Text is available under a CC BY-SA 4.0 International License; additional terms may apply. Images, videos and audio are available under their respective licenses.