Automative_Square_metro_station

List of Nagpur Metro stations

List of Nagpur Metro stations

Stations of the Nagpur Metro


This is a list of all stations of the Nagpur Metro, a rapid transit system serving the city of Nagpur in the Vidarbha region of Maharashtra, India.

Nagpur Metro rail map

Nagpur Metro is the 13th metro system in India.

It is built and operated by the Maharashtra Metro Rail Corporation Limited. Its first section was inaugurated on 7 March 2019[1] and opened for public on 8 March 2019, with the Orange Line. On 26 January 2020, the Aqua Line was partially inaugurated.[2] Nagpur Metro has 24 metro stations with a total route length of 26.1 kilometres (16.2 mi).[3] On 11 December 2022, PM Modi inaugurated the entire metro route length of 38.2 kilometres (23.7 mi).[4]

Metro stations

Terminal station
* Transfer station
†† Transfer station to Indian Railways / ISBT
#* Terminal and transfer station to Indian Railways / ISBT

The list given has only operational stations alphabetically-

More information Sr. No., Station Name ...

Statistics

Total number of metro stations 35
Number of interchange stations 1
Number of elevated stations 31
Number of underground stations 0
Number of stations at-grade 3

See also

Other Metro systems in India


References

  1. "Nagpur Metro Flagged Off by PM Modi, to Open For Public on Women's Day". News18. 7 March 2019. Retrieved 8 April 2019.
  2. P, Chennabasaveshwar (7 March 2019). "PM Modi inaugurates Nagpur Metro". Oneindia. Retrieved 8 April 2019.
  3. "Maha Metro opens first section of Aqua Line of Nagpur Metro Rail project". Urban Transport News. 28 January 2020. Retrieved 10 June 2020.
  4. Roy, Ashish (4 September 2020). "Four more Metro stations ready, CMRS inspection this month". The Times of India. Retrieved 5 January 2021.
  5. "Youth Killed as bike jumps speedbreaker at rahate colony". Nagpur Today. 15 June 2020. Retrieved 16 June 2020.
  6. Manka Behl (6 April 2021). "4 new Metro stations operational from today | Nagpur News - Times of India". The Times of India. Retrieved 21 August 2021.
  7. "Construction of new engineers metro station reach 3 completed". The live Nagpur. 24 August 2019. Retrieved 25 August 2019.
  8. "Jaiprakash nagar metro station to open soon". Times of India. 15 November 2019. Retrieved 16 November 2019.
  9. "Nagpur Metro extension: Stretch between Sitabuldi, Kasturchand Park inaugurated". The Indian Express. 21 August 2021. Retrieved 21 August 2021.
  10. "Underpass to provide direct link to Khapri metro station from Wardha". The Hitwada. 19 May 2020. Retrieved 20 May 2020.
  11. "Shankar Nagar, Rachna Junction metro stations get CRMS clearance". www.nagpurtoday.in. Retrieved 5 January 2021.
  12. "CMRS clears vasudeo nagar metro station". Times of India. 18 January 2020. Retrieved 19 January 2020.

    Share this article:

    This article uses material from the Wikipedia article Automative_Square_metro_station, and is written by contributors. Text is available under a CC BY-SA 4.0 International License; additional terms may apply. Images, videos and audio are available under their respective licenses.